

Large logistics tower that currently has 8 conveyors but can fit up to 16, a hypertube connection, and can be easily modified for pipeline support. Do this by deleting the belts and replacing with pipes, I suggest the top two belts on each side being replaced if you plan on using my midline tower blueprint. The tower supports are slightly sunk into the ground to better fuse into uneven landscapes. Hypertube includes a booster section for faster travel and easy access to the tube at each tower.
- מספר פריטים 166
- קטגוריות Architecture Power lines Exterior decorations Pipes system Tracks system Stable (1.0)
- דירוג
- Build version 385,279
- מחבר CrzdHaloman
- הורד (548x) Download SBP Download SBP Config
- File size 11.63 KB
- Created on 30 באפר׳ 2025, 03:11:16
- Last updated on 30 באפר׳ 2025, 03:11:48
- Live preview (Alpha Test) See blueprint