

Large logistics tower that currently has 8 conveyors but can fit up to 16, a hypertube connection, and can be easily modified for pipeline support. Do this by deleting the belts and replacing with pipes, I suggest the top two belts on each side being replaced if you plan on using my midline tower blueprint. The tower supports are slightly sunk into the ground to better fuse into uneven landscapes. Hypertube includes a booster section for faster travel and easy access to the tube at each tower.
- Items count 166
- Kategóriák Architecture Power lines Exterior decorations Pipes system Tracks system Stable (1.0)
- Rating
- Build version 385 279
- Author CrzdHaloman
- Letöltés (486x) Download SBP Download SBP Config
- Fájlméret 11,63 KB
- Created on 2025. ápr. 30. 3:11:16
- Last updated on 2025. ápr. 30. 3:11:48
- Live preview (Alpha Test) See blueprint