

Large logistics tower that currently has 8 conveyors but can fit up to 16, a hypertube connection, and can be easily modified for pipeline support. Do this by deleting the belts and replacing with pipes, I suggest the top two belts on each side being replaced if you plan on using my midline tower blueprint. The tower supports are slightly sunk into the ground to better fuse into uneven landscapes. Hypertube includes a booster section for faster travel and easy access to the tube at each tower.
- Recuento de objetos 166
- Categorías Architecture Power lines Exterior decorations Pipes system Tracks system Stable (1.0)
- Puntuación
- Versión de compilación 385.279
- Autor CrzdHaloman
- Descargar (581x) Descargar SBP Descargar configuración SBP
- Tamaño del archivo 11,63 KB
- Creado el 30/4/2025 3:11:16
- Última actualización el 30/4/2025 3:11:48
- Vista previa en vivo (Alpha Test) See blueprint