

Large logistics tower that currently has 8 conveyors but can fit up to 16, a hypertube connection, and can be easily modified for pipeline support. Do this by deleting the belts and replacing with pipes, I suggest the top two belts on each side being replaced if you plan on using my midline tower blueprint. The tower supports are slightly sunk into the ground to better fuse into uneven landscapes. Hypertube includes a booster section for faster travel and easy access to the tube at each tower.
- Liczba przedmiotów 166
- Kategorie Architecture Power lines Exterior decorations Pipes system Tracks system Stable (1.0)
- Klasyfikacja
- Wersja kompilacji 385 279
- Autor CrzdHaloman
- Pobierz (549x) Pobierz SBP Pobierz konfigurację SBP
- Rozmiar pliku 11,63 KB
- Data utworzenia 30 kwi 2025, 03:11:16
- Ostatnia aktualizacja 30 kwi 2025, 03:11:48
- Podgląd na żywo (Alpha Test) See blueprint