

Large logistics tower that currently has 8 conveyors but can fit up to 16, a hypertube connection, and can be easily modified for pipeline support. Do this by deleting the belts and replacing with pipes, I suggest the top two belts on each side being replaced if you plan on using my midline tower blueprint. The tower supports are slightly sunk into the ground to better fuse into uneven landscapes. Hypertube includes a booster section for faster travel and easy access to the tube at each tower.
- Hoeveelheid spullen 166
- Categorieën Architecture Power lines Exterior decorations Pipes system Tracks system Stable (1.0)
- Waardering
- Bouw variant 385.279
- Auteur CrzdHaloman
- Download (595x) SBP downloaden SBP Configuratie Downloaden
- Bestandsgrootte 11,63 KB
- Gecreëerd op 30 apr. 2025 03:11:16
- Laatst bijgewerkt op 30 apr. 2025 03:11:48
- Live voorbeeld (Alpha Test) See blueprint