

Large logistics tower that currently has 8 conveyors but can fit up to 16, a hypertube connection, and can be easily modified for pipeline support. Do this by deleting the belts and replacing with pipes, I suggest the top two belts on each side being replaced if you plan on using my midline tower blueprint. The tower supports are slightly sunk into the ground to better fuse into uneven landscapes. Hypertube includes a booster section for faster travel and easy access to the tube at each tower.
- Anzahl der Gegenstände 166
- Kategorien Architecture Power lines Exterior decorations Pipes system Tracks system Stable (1.0)
- Bewertung
- Build-Version 385.279
- Autor CrzdHaloman
- Herunterladen (493x) SBP herunterladen SBP-Konfiguration herunterladen
- Dateigröße 11,63 KB
- Erstellt am 30.04.2025 03:11:16
- Zuletzt aktualisiert am 30.04.2025 03:11:48
- Live-Vorschau (Alpha Test) See blueprint