Double Stacked Heavy Modular Frames

4 Heavy Modular Frames per minute

Input per minute (left to right): 20 Encased Industrial Beams, 60 Steel Pipes, 30 Reinforced Iron Plates, 19 Steel Beams,

Required Alt-Recipes: Steel Screws, Bolted Frames

Publishers Note:

This Blueprint certainly has allot to improve on, specifically using better ALT Recipes and incorporating the production of Reinforced Iron Plates internally.

  • 创建于 2023年9月11日 下午12:42:24
  • 最后更新于 2023年9月11日 下午1:01:22