Double Stacked Heavy Modular Frames

4 Heavy Modular Frames per minute

Input per minute (left to right): 20 Encased Industrial Beams, 60 Steel Pipes, 30 Reinforced Iron Plates, 19 Steel Beams,

Required Alt-Recipes: Steel Screws, Bolted Frames

Publishers Note:

This Blueprint certainly has allot to improve on, specifically using better ALT Recipes and incorporating the production of Reinforced Iron Plates internally.

  • 생성일: 2023. 9. 11. 오후 12:42:24
  • 마지막 업데이트: 2023. 9. 11. 오후 1:01:22