Double Stacked Heavy Modular Frames

4 Heavy Modular Frames per minute

Input per minute (left to right): 20 Encased Industrial Beams, 60 Steel Pipes, 30 Reinforced Iron Plates, 19 Steel Beams,

Required Alt-Recipes: Steel Screws, Bolted Frames

Publishers Note:

This Blueprint certainly has allot to improve on, specifically using better ALT Recipes and incorporating the production of Reinforced Iron Plates internally.

  • Created on Sep 11, 2023, 12:42:24 PM
  • Last updated on Sep 11, 2023, 1:01:22 PM