Double Stacked Heavy Modular Frames

4 Heavy Modular Frames per minute

Input per minute (left to right): 20 Encased Industrial Beams, 60 Steel Pipes, 30 Reinforced Iron Plates, 19 Steel Beams,

Required Alt-Recipes: Steel Screws, Bolted Frames

Publishers Note:

This Blueprint certainly has allot to improve on, specifically using better ALT Recipes and incorporating the production of Reinforced Iron Plates internally.

  • Antal genstande 257
  • Kategorier UPDATE 7
  • Skabt den 11/09/2023 12.42.24
  • Sidst opdateret den 11/09/2023 13.01.22