Grassfields Metalworks
This is a whole of Southern Grassfields build that produces various primary materials, to support a medium sized factory. It is basically my Grassfields Railway megaprint plus supporting production facilities.
Logistics
Production is spread out across the map close to resource nodes. In the south east of this build, I am using the naturally occurring cave system to run conveyors through (to avoid conveyor sprawl aboveground). Some of the cave entrances my require you to nobalisk them.
2 trains are provided to collect materials and deposit them into a central warehouse. An additional 2 train stations on the north east side of the rail ring are intended for collecting materials globally, with the only fixed requirements are packaged fuel (linked to the truck stations) and aluminium ingots (linked to aluminium recipe production).
Power is controlled from a substation at the north side of the rail ring.
Iron Plates Building
In the north, next to the substation. 24 Iron Plate constructors.
Copper and Beam Buildings
South east of the rail ring. Consists of:
- 10 x Steel Beam constructors
- 72 x Copper Sheet constructors
Aluminium and SAM processing Buildings
East side of the ring, south of the warehouse. Consists of:
- 18 x Alclad Aluminium Sheet assemblers
- 3 x Alclad Casing assemblers
- 2 x Ficsite Ingot converters
- 6 x Ficsite Trigon constructors
- 6 x Iron Wire constructors
- 3 x Steel Pipe constructors
- 2 x SAM Fluctuator manufacturers
Steelworks Building
East. Consists of:
- 10 x Encased Industrial Pipe assemblers
- 28 x Steel Pipe constructors
Mineral Batching Plant
East. Consists of:
- 24 x Concrete constructors
- 5 Compacted Coal constructors
Rod Assembler Buildings
West. Consists of:
- 40 x Iron Rod constructors
- 42 x Cast Screw constructors
Wire and Frame Assembler Buildings
West. Consists of:
- 16 x Iron Plate constructors
- 16 x Cable constructors
- 20 x Fused Wire assemblers
- 16 x Fused Quickwire assemblers
- 16 x Reinforced Plate assemblers
- 12 x Modular Frame assemblers
Modded Content
Enlarged pieces for roads and walls.
Version History
v1.0, v2.0: Early Access versions v3.0: Redone for Stable 1.0
- 项目计数 15,800
- 坐标 -70,840 / 234,839
- 仅粘贴在原始位置 Yes
- 类别 Architecture Complete factory Tracks system Modded Stable (1.0)
- 创建于 2020年9月28日 上午9:40:16
- 最后更新于 2024年10月27日 下午2:55:22
-
输电线
1,514
-
地基 (1米)
1,177
-
5级传送带
997
-
2级垂直传送带
759
-
基础墙壁(4 米)
684
-
倾斜墙壁(8 米)
628
-
1级垂直传送带
592
-
分离器
585
-
5级垂直传送带
515
-
1级墙壁接电桩
486
-
合并器
484
-
传送带立架
481
-
二等分地基(1米)
391
-
窗户(框架)
347
-
构筑站
290
-
地基 (1米)
273
-
地基(框架)
265
-
铁轨
237
-
大型支柱(混凝土)
229
-
3级传送带
224
-
2级传送带
206
-
4级传送带
204
-
地板(框架)
184
-
垂直传送带地板孔
169
-
地基 (4米)
154
-
冶炼站
133
-
基础墙壁(1 米)
128
-
传送带吊架
125
-
装配站
104
-
路灯
102
-
窗户(分格)
102
-
6级传送带
95
-
3级垂直传送带
92
-
吸顶灯
91
-
6级垂直传送带
91
-
倒置坡道(1米)
76
-
天桥(楼梯)
76
-
基础墙壁(4 米)
75
-
铸造站
74
-
工业级集装箱
72
-
小型支柱(混凝土)
66
-
窗户(框架)
63
-
4级垂直传送带
62
-
地基(玻璃框架)
60
-
窗户(分格)
60
-
区间信号灯
59
-
铁轨道岔控制杆
56
-
1级传送带
54
-
金属梁
53
-
漆刷梁
50
-
路径信号灯
47
-
倾斜墙壁(8 米)
43
-
基础墙壁(4 米)
42
-
窗户(分格)
42
-
方形牌(1 米)
41
-
天桥(直线)
38
-
电源开关
38
-
水平屋顶
35
-
墙壁(侧门)
34
-
FICSMAS造雪机
34
-
大型支柱(框架)
33
-
3级采矿机
33
-
地基 (1米)
32
-
竖向牌
32
-
货运站台
32
-
小型支柱(金属)
31
-
小型支柱(框架)
31
-
双面坡道 (2 米)
30
-
标签牌 (3)
30
-
天桥(拐角)
27
-
直梯
27
-
1级管道
27
-
2级管道
25
-
二等分地基(4米)
23
-
地基 (2米)
22
-
屋顶(1 米)
21
-
二等分地基(2米)
20
-
天桥(T形路口)
19
-
二等分地基(1米)
18
-
坡道(倒置框架)
18
-
存储集装箱
18
-
管道交叉接头
18
-
1级电线杆
18
-
外角延伸墙 (4 米)
16
-
窗户(幕墙框架)
16
-
倾斜凹角墙壁(8 米)
16
-
位面存储站上传器
16
-
三传送口墙壁
15
-
坡道墙壁(1 米)
14
-
自动门
14
-
智能分离器
14
-
地基 (1米)
13
-
屋顶(2 米)
12
-
灯光控制面板
12
-
传送口墙壁
11
-
工业栏杆
11
-
2级管道(光滑)
11
-
倒置凹角(1米)
10
-
倾斜墙壁(8 米)
10
-
基础墙壁(1 米)
10
-
天桥(交汇口)
10
-
传送带壁架
10
-
管道立架
10
-
倒置坡道墙壁(8 米)
9
-
方形牌(0.5 米)
9
-
管道壁架
9
-
双面坡道 (4 米)
8
-
倒置坡道墙壁(4 米)
8
-
精炼站
8
-
列车站
8
-
双面坡道 (2 米)
7
-
三重窗户(框架)
7
-
墙壁(侧门)
7
-
抽水站
7
-
屋顶(4 米)
6
-
窗户(单格)
6
-
现代栏杆
6
-
二等分地基(1米)
5
-
斜角(4 米)
5
-
倾斜墙壁(4 米)
5
-
天桥(坡道)
5
-
2级电线杆
5
-
双面坡道 (2 米)
4
-
水平屋顶
4
-
坡道墙壁(2 米)
4
-
窗户(框架)
4
-
优先电源开关
4
-
3级电线杆
4
-
倒置坡道(4米)
3
-
地基楼梯(2 米)
3
-
大型支柱(金属)
3
-
坡道墙壁(4 米)
3
-
坡道墙壁(4 米)
3
-
坡道墙壁(8 米)
3
-
墙壁(侧门)
3
-
墙壁(中央门)
3
-
双传送口墙壁
3
-
路障
3
-
凸角坡道 (1 米)
2
-
双传送口墙壁
2
-
传送口墙壁
2
-
围栏(高)
2
-
转化站
2
-
制造站
2
-
工业级液体缓冲罐
2
-
卡车站
2
-
堆叠式传送带立架
2
-
1级管道增压泵
2
-
倒置凸角(1米)
1
-
倒置凸角(1米)
1
-
凹角坡道(1 米)
1
-
斜角(1 米)
1
-
双面坡道 (8 米)
1
-
倒置坡道墙壁(1 米)
1
-
倒置坡道墙壁(2 米)
1
-
坡道墙壁(1 米)
1
-
六边框架窗户
1
-
墙壁(框架)
1
-
倾斜墙壁(4 米)
1
-
三传送口墙壁
1
-
展示牌
1
-
管道穿墙孔
1
-
输电塔(平台)
1
-
混凝土
30,072
-
电线
11,346
-
急速电线
6,896
-
电缆
6,364
-
铁板
6,306
-
钢梁
5,469
-
铁棒
4,392
-
钢管
3,970
-
强化铁板
3,465
-
FICSMAS“真雪”
3,400
-
复合铝板
2,027
-
塑料
1,386
-
转子
1,298
-
二氧化硅
1,296
-
模块化框架
970
-
钢筋混凝土梁
818
-
铁制FICSMAS挂饰
680
-
石英晶体
629
-
铜板
513
-
SAM物质波波动器
360
-
焊接模块化框架
350
-
拐杖糖
340
-
时间水晶
277
-
F金三角
277
-
马达
260
-
高速连接器
199
-
超级计算机
165
-
计算机
106
-
无线电控制单元
100
-
涡轮马达
99
-
便携式采矿机
99
-
AI限制器
88
-
冷却系统
50
-
梅瑟尔球
16
-
橡胶
12
-
xbb1024 - 2022年11月16日 上午9:09:24
I've added the inputs to the description
-
MadsOlsvig - 2022年10月23日 下午7:38:19
@xbb1024 Do you have a list of requied raw items?
-
BlazerBuddy - 2022年2月14日 上午3:25:56
Is it possible to have a raw items per minute list? I don't want to go to each individual smelter and count which raw materials I need.