混凝土

混凝土

Used for building.
Good for stable foundations.

  • 类别 Minerals
  • 堆叠数量 500
  • Resource Sink Points 12
配方 1
混凝土
(45 / min)3x石灰石 石灰石
(15 / min)1x混凝土 混凝土
替代配方 3
Alternate: Rubber Concrete
(50 / min)10x石灰石 石灰石
(10 / min)2x橡胶 橡胶
(45 / min)9x混凝土 混凝土
替代:优良的的混凝土
(7.5 / min)3x硅
(30 / min)12x石灰石 石灰石
(25 / min)10x混凝土 混凝土
替代:塑性混凝土
(120 / min)6x石灰石 石灰石
(100m³ / min)5m³水
(80 / min)4x混凝土 混凝土
用来解锁 11
成本
Base Building (Tier 1 / 120s)
Unlocks: 瞭望塔 瞭望塔, Foundation 1m Foundation 1m, Foundation 2m Foundation 2m, Foundation 4m Foundation 4m, Ramp 1m Ramp 1m, Ramp 2m Ramp 2m, Ramp 4m Ramp 4m, Basic Wall 4m Basic Wall 4m, Basic Wall 1m Basic Wall 1m
200
100
100
Obstacle Clearing (Tier 2 / 180s)
Unlocks: 电锯 电锯, Solid Biofuel Solid Biofuel, 3 Inventory Slot(s)
500
100
100
Resource Sink Bonus Program (Tier 2 / 300s)
Unlocks: AWESOME 粉碎机 AWESOME 粉碎机, AWESOME 商店 AWESOME 商店, 彩色子弹 彩色子弹
400
500
200
200
Logistics Mk.2 (Tier 2 / 360s)
Unlocks: 二级传送带 二级传送带, 可叠起堆放的运输管道 可叠起堆放的运输管道, 二级垂直传送带 二级垂直传送带
50
200
300
300
Basic Steel Production (Tier 3 / 480s)
Unlocks: 铸造器 铸造器, 钢锭 钢锭, 钢梁 钢梁, 钢管 钢管, 多功能框架 多功能框架
50
150
300
1,000
Advanced Steel Production (Tier 4 / 600s)
Unlocks: 二级采矿器 二级采矿器, 钢筋混凝土梁 钢筋混凝土梁, 定子 定子, 电机 电机, Automated Wiring Automated Wiring, 重型模块化框架 重型模块化框架
200
200
1,500
300
Logistics Mk.3 (Tier 4 / 300s)
Unlocks: Power Storage Power Storage, 工业存储器 工业存储器, 三级传送带 三级传送带, 三级垂直传送带 三级垂直传送带, 可堆叠管道支架 可堆叠管道支架
200
100
500
Nuclear Power (Tier 8 / 900s)
Unlocks: Encased Uranium Cell, 电磁控制杆 电磁控制杆, Uranium Fuel Rod Uranium Fuel Rod, 核电站 核电站, Magnetic Field Generator Magnetic Field Generator
50
200
1,000
2,000
枢纽升级4 (Tier 0 / 0s)
Unlocks: 输送杆 输送杆, 一级传送带 一级传送带, 3 Inventory Slot(s)
75
20
10
枢纽升级5 (Tier 0 / 0s)
Unlocks: 一级采矿器 一级采矿器, 存储器 存储器, 3 Inventory Slot(s)
75
50
20
枢纽升级6 (Tier 0 / 0s)
Unlocks: 太空电梯 太空电梯, 生物质发电机 生物质发电机, 生物质 Biomass (Wood), 生物质 Biomass (Leaves)
100
100
100
50
用于制作 252
输入 输入率 输出率 输出 生产于
Basic Wall 1m
---
Basic Wall 4m
---
Conveyor Wall x1
---
Conveyor Wall x2
---
Conveyor Wall x3
---
Tilted Corner Wall 4m
---
Tilted Corner Wall 8m
---
Tilted Wall 4m
---
Tilted Wall 8m
---
Center Door Wall
---
Inv. Ramp Wall 1m
---
Inv. Ramp Wall 2m
---
Inv. Ramp Wall 4m
---
Inv. Ramp Wall 8m
---
Gate Hole Wall
---
Side Door Wall
---
Ramp Wall 1m
---
Ramp Wall 2m
---
Ramp Wall 4m
---
Ramp Wall 8m
---
Basic Wall 4m
---
Conveyor Wall x3
---
Conveyor Wall x2
---
Conveyor Wall x1
---
Center Door Wall
---
Side Door Wall
---
Gate Hole Wall
---
Basic Wall 1m
---
Tilted Corner Wall 4m
---
Tilted Corner Wall 8m
---
Tilted Wall 4m
---
Tilted Wall 8m
---
Inv. Ramp Wall 1m
---
Inv. Ramp Wall 2m
---
Inv. Ramp Wall 4m
---
Inv. Ramp Wall 8m
---
Ramp Wall 1m
---
Ramp Wall 2m
---
Ramp Wall 4m
---
Ramp Wall 8m
---
Gate Hole Wall
---
Tilted Corner Wall 4m
---
Tilted Corner Wall 8m
---
Basic Wall 1m
---
Inv. Ramp Wall 1m
---
Inv. Ramp Wall 2m
---
Inv. Ramp Wall 4m
---
Inv. Ramp Wall 8m
---
Ramp Wall 1m
---
Ramp Wall 2m
---
Ramp Wall 4m
---
Ramp Wall 8m
---
Basic Wall 4m
---
Conveyor Wall x3
---
Conveyor Wall x2
---
Conveyor Wall x1
---
Center Door Wall
---
Side Door Wall
---
Tilted Wall 4m
---
Tilted Wall 8m
---
输送杆
---
一级电线杆
---
一级采矿器
10x铁板 铁板
---
太空电梯
250x铁板 铁板
400x铁棒 铁棒
1,500x电线 电线
Giant FICSMAS Tree
---
Pillar Top
Tilted Wall 4m
---
Wall Conveyor Perpendicular
---
Wall Conveyor Perpendicular
---
Panel Window
管道支架
---
AWESOME 粉碎机
30x电缆 电缆
---
Encased Uranium Cell
10x铀
8m³硫酸 硫酸
( 50 / min )
( 15 / min )
( 40m³ / min )
( 25 / min )
( 10m³ / min )
2m³硫酸 硫酸
钢筋混凝土梁
( 24 / min )
( 30 / min )
( 6 / min )
铸造器
10x转子 转子
---
封装钚电池
( 10 / min )
( 20 / min )
( 5 / min )
核电站
100x电缆 电缆
---
替代:重型集装模块化框架
36x钢管 钢管
( 7.5 / min )
( 9.375 / min )
( 33.75 / min )
( 20.625 / min )
( 2.8125 / min )
替代:封闭式钢管
( 28 / min )
( 20 / min )
( 4 / min )
Foundation 1m
---
Foundation 2m
---
Foundation 4m
---
Ramp 1m
---
Ramp 2m
---
Ramp 4m
---
Inv. Ramp 4m
---
Double Ramp 8m
---
Down Corner Ramp 1m
---
Up Corner Ramp 1m
---
Down Corner Ramp 2m
---
Up Corner Ramp 2m
---
Down Corner Ramp 4m
---
Up Corner Ramp 4m
---
Double Ramp 4m
---
Double Ramp 2m
---
Inv. Ramp 1m
---
Inv. Up Corner 1m
---
Inv. Down Corner 1m
---
Inv. Ramp 2m
---
Inv. Up Corner 2m
---
Inv. Down Corner 2m
---
Inv. Up Corner 4m
---
Inv. Down Corner 4m
---
可叠起堆放的运输管道
---
Stackable Hypertube Support
---
Hypertube Support
---
可堆叠管道支架
---
货运平台
25x电缆 电缆
---
液体货运平台
25x电缆 电缆
---
空平台
---
Empty Platform With Catwalk
---
火车站
25x电缆 电缆
---
电杆二型
---
Beam Connector
---
Beam Connector Double
---
Beam Support
---
Glass Frame Foundation
---
Small Metal Pillar
---
Small Pillar Support
---
Big Pillar Support
---
Big Metal Pillar
---
Foundation 1m
---
Foundation 2m
---
Foundation 4m
---
Inv. Down Corner 1m
---
Inv. Down Corner 2m
---
Inv. Down Corner 4m
---
Inv. Ramp 1m
---
Inv. Ramp 2m
---
Inv. Ramp 4m
---
Inv. Up Corner 1m
---
Inv. Up Corner 2m
---
Inv. Up Corner 4m
---
Down Corner Ramp 1m
---
Down Corner Ramp 2m
---
Down Corner Ramp 4m
---
Ramp 1m
---
Ramp 2m
---
Ramp 4m
---
Up Corner Ramp 1m
---
Up Corner Ramp 2m
---
Up Corner Ramp 4m
---
Double Ramp 2m
---
Double Ramp 4m
---
Double Ramp 8m
---
Foundation 1m
---
Foundation 2m
---
Foundation 4m
---
Inv. Ramp 1m
---
Inv. Ramp 2m
---
Inv. Ramp 4m
---
Inv. Down Corner 1m
---
Inv. Down Corner 2m
---
Inv. Down Corner 4m
---
Inv. Up Corner 1m
---
Inv. Up Corner 2m
---
Inv. Up Corner 4m
---
Ramp 1m
---
Ramp 2m
---
Ramp 4m
---
Down Corner Ramp 1m
---
Down Corner Ramp 2m
---
Down Corner Ramp 4m
---
Up Corner Ramp 1m
---
Up Corner Ramp 2m
---
Up Corner Ramp 4m
---
Double Ramp 2m
---
Double Ramp 4m
---
Double Ramp 8m
---
Foundation 1m
---
Foundation 2m
---
Foundation 4m
---
Inv. Down Corner 1m
---
Inv. Down Corner 2m
---
Inv. Down Corner 4m
---
Inv. Ramp 1m
---
Inv. Ramp 2m
---
Inv. Ramp 4m
---
Inv. Up Corner 1m
---
Inv. Up Corner 2m
---
Inv. Up Corner 4m
---
Down Corner Ramp 1m
---
Down Corner Ramp 2m
---
Down Corner Ramp 4m
---
Ramp 1m
---
Ramp 2m
---
Ramp 4m
---
Up Corner Ramp 1m
---
Up Corner Ramp 2m
---
Up Corner Ramp 4m
---
Double Ramp 2m
---
Double Ramp 4m
---
Double Ramp 8m
---
台阶左
---
楼梯右
---
壁挂式传送带
---
Hypertube Wall Hole
---
Hypertube Wall Support
---
管道墙壁支架
---
管道墙洞
---
Small Concrete Pillar
---
Big Concrete Pillar
---
Conveyor Lift Floor Hole
---
Quarter Pipe
---
Inverted Quarter Pipe
---
Inner Corner Quarter Pipe
---
Inverted Inner Corner Quarter Pipe
---
Outer Corner Quarter Pipe
---
Inverted Outer Corner Quarter Pipe
---
Road Barrier
---
Hypertube Floor Hole
---
Pipeline Floor Hole
---
FICSIT Roof Flat
---
FICSIT Roof 1m
---
FICSIT Roof 2m
---
FICSIT Roof 4m
---
Foundation 1m
---
Foundation 2m
---
Foundation 4m
---
Inv. Ramp 1m
---
Inv. Ramp 2m
---
Inv. Ramp 4m
---
Inv. Down Corner 1m
---
Inv. Down Corner 2m
---
Inv. Down Corner 4m
---
Inv. Up Corner 1m
---
Inv. Up Corner 2m
---
Inv. Up Corner 4m
---
Ramp 1m
---
Ramp 2m
---
Ramp 4m
---
Down Corner Ramp 1m
---
Down Corner Ramp 2m
---
Down Corner Ramp 4m
---
Up Corner Ramp 1m
---
Up Corner Ramp 2m
---
Up Corner Ramp 4m
---
Double Ramp 2m
---
Double Ramp 4m
---
Double Ramp 8m
---
Glass Roof Flat
---
Glass Roof 1m
---
Glass Roof 2m
---
Glass Roof 4m
---
Metal Roof Flat
---
Metal Roof 1m
---
Metal Roof 2m
---
Metal Roof 4m
---
Tar Roof Flat
---
Tar Roof 1m
---
Tar Roof 2m
---
Tar Roof 4m
---