Beton

Wordt gebruikt voor gebouwen. Goed voor stabiele funderingen.
- Category Materialen
- Stapel Groote 100
- Resource Sink Points 12
Alternate recipes
3
Alternate: Rubber Concrete
Alternate: Wet Concrete
alternatief: fijn beton
Used to unlock
10
Cost | ||
---|---|---|
![]() |
Base Building (Tier 1 / 120s) Unlocks: verkenningstoren, Fundering 8m x 1m, Fundering 8m x 2m, Fundering 8m x 4m, Ramp 8m x 1m, Helling 8m x 2m, Helling 8m x 4m, Muur 8m x 4m (plaat), Muur 8m x 4m (plaat) |
![]() ![]() ![]() |
![]() |
Obstacle Clearing (Tier 2 / 180s) Unlocks: Chainsaw, Solid Biofuel, 5 Inventory Slot(s) |
![]() ![]() ![]() |
![]() |
Resource Sink Bonus Program (Tier 2 / 300s) Unlocks: AWESOME Afvoer, AWESOME Winkel |
![]() ![]() ![]() ![]() |
![]() |
Logistics Mk.2 (Tier 2 / 360s) Unlocks: Transportband V2, Stackable Conveyor Pole, Transportband Lift V2 |
![]() ![]() ![]() ![]() |
![]() |
Basic Steel Production (Tier 3 / 480s) Unlocks: Gieterij, Staalstaaf, Stalen Balk, Stalen Pijp, Versatile Framework |
![]() ![]() ![]() ![]() |
![]() |
Advanced Steel Production (Tier 4 / 0s) Unlocks: Mijner V2, Verpakte Industriële Balk, stator, motor, Automated Wiring, zware modulaire frame |
![]() ![]() ![]() ![]() |
![]() |
Logistics Mk.3 (Tier 4 / 300s) Unlocks: Industriële Opslag Container, Transportband V3, Transportband Lift V3, Stackable Pipeline Support |
![]() ![]() ![]() |
HUB Upgrade 4 (Tier 0 / 0s) Unlocks: Transportbandsteunpaal, Conveyor Belt Mk.1, 3 Inventory Slot(s) |
![]() ![]() ![]() |
|
HUB Upgrade 5 (Tier 0 / 0s) Unlocks: Miner Mk1, Opslag Container |
![]() ![]() ![]() |
|
HUB Upgrade 6 (Tier 0 / 0s) Unlocks: Ruimtelift, Biomassa Verbrander, Biomass (Wood), Biomass (Leaves) |
![]() ![]() ![]() ![]() |
Gebruik Voor Knutselen
87
Invoer | Invoer Ratio | Uitvoer Ratio | Uitvoer | Produced in |
---|---|---|---|---|
Transportbandsteunpaal |
||||
1x ![]() |
--- | |||
Power Pole Mk.1 |
||||
3x ![]() 1x ![]() |
--- | |||
Ruimtelift |
||||
500x ![]() 250x ![]() 400x ![]() 1.500x ![]() |
1x ![]() |
|||
Miner Mk1 |
||||
10x ![]() 10x ![]() |
1x ![]() |
--- | ||
Giant FICSMAS Tree |
||||
100x ![]() 500x ![]() |
--- | |||
Stairs |
||||
4x ![]() |
--- | |||
muur transportband loodrecht (plaat) |
||||
3x ![]() |
--- | |||
muur met loodrechte transportband (plaatmetaal) |
||||
3x ![]() |
--- | |||
Panel Window (Plating) |
||||
3x ![]() |
1x ![]() |
--- | ||
Panel Window (Sheet Metal) |
||||
3x ![]() |
--- | |||
Pijplijn Ondersteuning |
||||
2x ![]() |
--- | |||
Verpakte Industriële Balk |
||||
4x ![]() 5x ![]() |
(
24 / min
)
(
30 / min
)
|
(
6 / min
)
|
||
Gieterij |
||||
10x ![]() 10x ![]() 20x ![]() |
1x ![]() |
--- | ||
Encased Uranium Cell |
||||
40x ![]() 9x ![]() |
(
40 / min
)
(
9 / min
)
|
(
10 / min
)
|
||
Kerncentrale |
||||
150x ![]() 50x ![]() |
1x ![]() |
--- | ||
alternatief:zware ingepakte frame |
||||
36x ![]() 22x ![]() |
(
7,5 / min
)
(
9,375 / min
)
(
33,75 / min
)
(
20,625 / min
)
|
(
2,8125 / min
)
|
||
alternatief: ingepakte industriele pijp |
||||
7x ![]() 5x ![]() |
(
28 / min
)
(
20 / min
)
|
(
4 / min
)
|
||
Fundering 8m x 1m |
||||
6x ![]() |
--- | |||
Fundering 8m x 2m |
||||
6x ![]() |
--- | |||
Fundering 8m x 4m |
||||
6x ![]() |
--- | |||
Ramp 8m x 1m |
||||
3x ![]() |
1x ![]() |
--- | ||
Helling 8m x 2m |
||||
4x ![]() |
--- | |||
Helling 8m x 4m |
||||
5x ![]() |
--- | |||
Muur 8m x 4m (plaat) |
||||
3x ![]() |
--- | |||
Muur 8m x 4m (plaat) |
||||
3x ![]() |
--- | |||
AWESOME Afvoer |
||||
30x ![]() 45x ![]() |
--- | |||
Stackable Conveyor Pole |
||||
2x ![]() |
--- | |||
Stackable Hyper Tube Support |
||||
2x ![]() |
--- | |||
Hyper Tube Support |
||||
2x ![]() |
--- | |||
Stackable Pipeline Support |
||||
2x ![]() |
--- | |||
Vrachtplatform |
||||
2x ![]() 50x ![]() 25x ![]() 5x ![]() |
--- | |||
Vloeistof Vrachtplatform |
||||
2x ![]() 50x ![]() 25x ![]() 5x ![]() |
--- | |||
Leeg Platform |
||||
50x ![]() |
--- | |||
Trein Station |
||||
8x ![]() 50x ![]() 25x ![]() |
--- | |||
Elektriciteitspaal V2 |
||||
6x ![]() 2x ![]() |
--- | |||
muur transportband x3 (plaatmetaal) |
||||
3x ![]() |
--- | |||
muur transportband x2 (plaatmetaal) |
||||
3x ![]() |
--- | |||
muur transportband x1 (plaatmetaal) |
||||
3x ![]() |
--- | |||
muur transportband x3 (plaat) |
||||
3x ![]() |
--- | |||
muur transportband x2 (plaat) |
||||
3x ![]() |
--- | |||
muur transportband x1 (plaat) |
||||
3x ![]() |
--- | |||
Muurbevestiging voor transportband |
||||
2x ![]() |
--- | |||
Quarter Pipe |
||||
6x ![]() |
1x ![]() |
--- | ||
Inverted Quarter Pipe |
||||
6x ![]() |
--- | |||
Inner-Corner Quarter Pipe |
||||
6x ![]() |
--- | |||
Inverted Inner-Corner Quarter Pipe |
||||
6x ![]() |
--- | |||
Outer-Corner Quarter Pipe |
||||
6x ![]() |
--- | |||
Inverted Outer-Corner Quarter Pipe |
||||
6x ![]() |
--- | |||
Down Corner Ramp 8m x 1m |
||||
2x ![]() |
--- | |||
Up Corner Ramp 8m x 1m |
||||
2x ![]() |
--- | |||
Down Corner Ramp 8m x 2m |
||||
3x ![]() |
--- | |||
Up Corner Ramp 8m x 2m |
||||
3x ![]() |
--- | |||
Down Corner Ramp 8m x 4m |
||||
4x ![]() |
--- | |||
Up Corner Ramp 8m x 4m |
||||
4x ![]() |
--- | |||
Center Door Wall (Sheet Metal) |
||||
3x ![]() |
--- | |||
Left Door Wall (Sheet Metal) |
||||
3x ![]() |
--- | |||
Right Door Wall (Sheet Metal) |
||||
3x ![]() |
--- | |||
Muur met gecentreerde deur (plaat) |
||||
3x ![]() |
--- | |||
Left Door Wall (Plating) |
||||
3x ![]() |
--- | |||
Right Door Wall (Plating) |
||||
3x ![]() |
--- | |||
Gate Wall (Plating) |
||||
3x ![]() |
--- | |||
paalbasis |
||||
6x ![]() |
1x ![]() |
--- | ||
paal midden |
||||
6x ![]() |
1x ![]() |
--- | ||
paaltop |
||||
6x ![]() |
1x ![]() |
--- | ||
Double Ramp 8m x 8m |
||||
5x ![]() |
--- | |||
Double Ramp 8m x 4m |
||||
5x ![]() |
--- | |||
Double Ramp 8m x 2m |
||||
5x ![]() |
--- | |||
Frame Foundation 8m x 4m |
||||
6x ![]() |
--- | |||
Glass Foundation 8m x 1m |
||||
6x ![]() |
--- | |||
Hyper Tube Muurgat |
||||
2x ![]() |
--- | |||
Hyper Tube Wall Support |
||||
2x ![]() |
--- | |||
Up Corner 8m x 1m Inverted |
||||
5x ![]() |
--- | |||
Down Corner 8m x 1m Inverted |
||||
5x ![]() |
--- | |||
Up Corner 8m x 2m Inverted |
||||
5x ![]() |
--- | |||
Down Corner 8m x 2m Inverted |
||||
5x ![]() |
--- | |||
Up Corner 8m x 4m Inverted |
||||
5x ![]() |
--- | |||
Down Corner 8m x 4m Inverted |
||||
5x ![]() |
--- | |||
Inverted Ramp 8m x 4m |
||||
5x ![]() |
--- | |||
Inverted Ramp 8m x 1m |
||||
5x ![]() |
--- | |||
Inverted Ramp 8m x 2m |
||||
5x ![]() |
--- | |||
Trap Links |
||||
5x ![]() |
1x ![]() |
--- | ||
Trap Rechts |
||||
5x ![]() |
1x ![]() |
--- | ||
Pipeline Wall Support |
||||
2x ![]() |
--- | |||
Pipeline Wall Hole |
||||
2x ![]() |
--- | |||
Single Window (Plating) |
||||
3x ![]() |
--- | |||
Frame Window (Plating) |
||||
3x ![]() |
1x ![]() |
--- | ||
Reinforced Window (Plating) |
||||
3x ![]() |
--- |