

A straight segment of the road ending with a crosswalk. 2 lanes, 12m each, with a walkway and space below for a hidden conveyor bus.
- Items count 49
- หมวด Architecture Tracks system
- Rating
- Build version 208,572
- Author EduardoS
- รับ (3,253x) Download SBP Download SBP Config
- File size 3.42 KB
- Created on 19 พ.ย. 2022 22:23:25
- Last updated on 19 พ.ย. 2022 22:24:19
- Live preview (Alpha Test) See blueprint