

A straight segment of the road ending with a crosswalk. 2 lanes, 12m each, with a walkway and space below for a hidden conveyor bus.
- Items count 49
- الفئات Architecture Tracks system
- Rating
- Build version 208٬572
- Author EduardoS
- تحميل (3٬279x) Download SBP Download SBP Config
- File size 3٫42 KB
- Created on 19/11/2022 10:23:25 م
- Last updated on 19/11/2022 10:24:19 م
- Live preview (Alpha Test) See blueprint