A straight segment of the road ending with a crosswalk. 2 lanes, 12m each, with a walkway and space below for a hidden conveyor bus.
- Items count 49
- Categories Architecture Tracks system
- Rating
- Build version 208,572
- Author EduardoS
- Download (1,976x) Download SBP Download SBP Config
- File size 3.42 KB
- Created on Nov 19, 2022, 10:23:25 PM
- Last updated on Nov 19, 2022, 10:24:19 PM
- Live preview (Alpha Test) See blueprint