Refin Center
All of the oil in the world has manually been pumped to one central location, Refin Center, at the center of the map. Using next-level engineering the pipework is all done underground which avoids any pre-existing builds. At every oil field there is a hypertube which grants access to the facility, however the entire facility will need to be powered up before hand. This will cost about 7,000 MW. Since the facility is underground expansion into a massive factory is the easiest it will ever be but pulling products into or out of the facility will become a new obstacle.
- Items count 34 504
- Coordinates 8 713 / 2 213
- Only paste on original location Yes
- Categories Architecture Interior decorations Exterior decorations Pipes system World Grid Aligned UPDATE 7 UPDATE 8
- Created on 4.4.2023 6:06:14
-
Basic Wall (4 m)
11 440
-
Straight Walkway
2 470
-
Kovový nosník
2 184
-
Foundation (1 m)
2 013
-
Príchytka potrubia na stenu
1 971
-
Elektrické vedenie
1 365
-
Rámová podlaha
1 237
-
Flat Roof
1 222
-
Spojka nosníkov
1 082
-
Clean Pipeline Mk.2
999
-
Malý betónový pilier
933
-
Potrubie vz. 2
837
-
Foundation (4 m)
676
-
Farebný nosník
631
-
Stropné svetlo
611
-
Podpera nosníka
604
-
Nástenná prípojka vz. 1
599
-
Foundation (2 m)
455
-
Podpera potrubia
291
-
Foundation (1 m)
186
-
Betónové zvodidlo
181
-
Foundation (1 m)
176
-
Basic Wall (4 m)
175
-
Stĺp elektrického vedenia vz. 1
159
-
Potrubie vz. 1
152
-
Otvor na prechod potrubia cez stenu
110
-
Otvor na prechod potrubia cez podlahu
108
-
Priemyselné zábradie
81
-
Stohovateľná podpera potrubia
69
-
Rámové základy
50
-
Hypertrubica
41
-
Moderné zábradlie
38
-
Ropný vrt
30
-
Inverted Ramp (2 m)
28
-
Clean Pipeline Mk.1
27
-
Vchod do hypertrubice
26
-
Rebrík
25
-
Label Sign (4 m)
25
-
Pipeline Junction
25
-
Podpera hypertrubice
23
-
Otvor na prechod hypertrubice cez podlahu
22
-
Basic Wall (1 m)
17
-
Foundation (4 m)
15
-
Inverted Ramp (4 m)
13
-
Presklené okno s oceľovým rámom
12
-
Zberač hydraulického štiepenia
12
-
Tabuľa v tvare displeja
11
-
Chodníková rampa
10
-
Straight Catwalk
10
-
Foundation (1 m)
9
-
Priemyselná nádrž
9
-
Obojstranná nástenná prípojka vz. 1
9
-
Basic Wall (1 m)
8
-
Dopravníkový stĺp
8
-
Ramp (2 m)
7
-
Inverted Ramp (2 m)
5
-
Double Beam Connector
5
-
Up Corner Ramp (1 m)
4
-
Ramp (1 m)
4
-
Inverted Down Corner (2 m)
4
-
Stena s dverami v strede
4
-
Chodníková odbočka
4
-
Pásový dopravník vz. 4
4
-
Ramp (1 m)
3
-
Roof (4 m)
3
-
Walkway T-Junction
3
-
Veľká tabuľa
3
-
Otvor na prechod hypertrubice cez stenu
3
-
Stĺp elektrického vedenia vz. 2
3
-
Ramp (4 m)
2
-
Stena s dverami na boku
2
-
Walkway Intersection
2
-
Vrt hydraulického štiepenia
2
-
Ventil
2
-
Inverted Ramp (1 m)
1
-
Ramp (4 m)
1
-
Light Control Panel
1
-
Stena s dverami v strede
1
-
Mostíkové schody
1
-
Mostík s rohom
1
-
Malá tabuľa
1
-
Osobná úložná škatuľa
1
-
Príchytka hypertrubice na stenu
1
-
Vypínač
1
-
Stĺp elektrického vedenia vz. 3
1
-
Betón
86 549
-
Rýchlodrôt
30 588
-
Drôt
12 721
-
Železný plát
10 906
-
Železná tyč
10 800
-
Oceľový nosník
9 361
-
Medený plech
4 171
-
Kábel
3 175
-
Plast
2 513
-
Železobetónový nosník
792
-
Motor
550
-
Oceľová rúra
303
-
Guma
211
-
Kryštál kremeňa
155
-
Hliníkové puzdro
120
-
Rotor
104
-
Duralový plech
100
-
Ťažký modulárny rám
50
-
Spevnený železný plát
27
-
Kremenný piesok
24
-
Rádiová riadiaca jednotka
20
-
Kryštálový oscilátor
16
-
Obmedzovač AI
4
-
Vysokorýchlostný konektor
2
-
Bobbert - 27.5.2023 19:52:41
No conflict with global rail networks and extremely low power requirement to get all the oil in the game to one singular location. All of the underground piping tunnels are accessible, but the whole "Refin Center" is completely underground which makes it a little harder to get the finished products to other factories.