Refin Center
All of the oil in the world has manually been pumped to one central location, Refin Center, at the center of the map. Using next-level engineering the pipework is all done underground which avoids any pre-existing builds. At every oil field there is a hypertube which grants access to the facility, however the entire facility will need to be powered up before hand. This will cost about 7,000 MW. Since the facility is underground expansion into a massive factory is the easiest it will ever be but pulling products into or out of the facility will become a new obstacle.
- Hoeveelheid spullen 34.504
- Coördinaten 8.713 / 2.213
- Alleen plakken op originele locatie Yes
- Categorieën Architecture Interior decorations Exterior decorations Pipes system World Grid Aligned UPDATE 7 UPDATE 8
-
Waardering
3 / 5
- Bouw variant 211.839
- Auteur Hunnoz
- Download (639x) Download
- Bestandsgrootte 1,08 MB
- Gecreëerd op 4 apr. 2023 06:06:14
-
Standaard Muur 4m
11.440
-
Loopbrug Recht
2.470
-
Metalen Balk
2.184
-
Fundering 1m
2.013
-
Pijpleidingsmuursteun
1.971
-
Stroomkabel
1.365
-
Frame Vloer
1.237
-
Plat Dak
1.222
-
Balk Verbindingspunt
1.082
-
Pijpleiding Mk.2 (Geen Indicator)
999
-
Kleine Betonnen Pilaar
933
-
Pijpleiding Mk.2
837
-
Fundering 4m
676
-
Gespoten Balk
631
-
Plafondlamp
611
-
Steunbalk
604
-
Wandcontact Mk.1
599
-
Fundering 2m
455
-
Pijpleidingsondersteuning
291
-
Fundering 1m
186
-
Wegbarrière
181
-
Fundering 1m
176
-
Standaard Muur 4m
175
-
Kabelmast Mk.1
159
-
Pijpleiding Mk.1
152
-
Muurdoorgang Pijpleiding
110
-
Vloergat Pijpleiding
108
-
Industriële Reling
81
-
Stapelbare Pijpleidingsondersteuning
69
-
Frame Fundering
50
-
Hyperbuizen
41
-
Moderne Reling
38
-
Oliezuiger
30
-
Omgekeerde Helling 2m
28
-
Pijpleiding Mk.1 (Geen Indicator)
27
-
Hyperbuis ingang
26
-
Ladder
25
-
Labelbord 4m
25
-
Pijpleidingskruispunt
25
-
Hyperbuisondersteuning
23
-
Hyperbuis Muurgat
22
-
Standaard Muur 1m
17
-
Fundering 4m
15
-
Omgekeerde Helling 4m
13
-
Volledig Frame Raam
12
-
Springbronontginner
12
-
Uithang bord
11
-
Wandelpad Helling
10
-
Catwalk Recht
10
-
Fundering 1m
9
-
Industriële Vloeistoffenbuffer
9
-
Dubbel Wandcontact Mk.1
9
-
Standaard Muur 1m
8
-
Ondersteuning Transportband
8
-
Helling 2m
7
-
Biomassa Generator
6
-
Omgekeerde Helling 2m
5
-
Balk verbindingspunt dubbel
5
-
Hoek Helling Omhoog 1m
4
-
Helling 1m
4
-
Omgekeerde Hoek Omlaag 2m
4
-
Muur met Deur Midden
4
-
Wandelpad Bocht
4
-
Transportband Mk.4
4
-
Helling 1m
3
-
Dak 4m
3
-
Wandelpad T-splitsing
3
-
Groot Reclamebord
3
-
Muurdoorgang Hyperbuis
3
-
Kabelmast Mk.2
3
-
Helling 4m
2
-
Muur met Deur Zijkant
2
-
Wandelpad Kruising
2
-
Grondstof Aardbron Drukregelaar
2
-
Klep
2
-
Omgekeerde Helling 1m
1
-
Helling 4m
1
-
Lichtbedieningspaneel
1
-
Muur met Deur Midden
1
-
Loopbrug Trap
1
-
Catwalk Hoek
1
-
Klein Reclamebord
1
-
Persoonlijke opslag
1
-
Hyperbuis Muurondersteuning
1
-
Stroomschakelaar
1
-
Kabelmast Mk.3
1
-
Beton
56.891
-
Hogesnelheidsdraad
30.588
-
Draad
13.271
-
Stalen balk
12.176
-
IJzeren Stang
10.890
-
IJzeren plaat
5.954
-
Koperen plaat
4.081
-
Kabel
3.175
-
Kunststof
2.226
-
Gewapend Betonnen Balk
847
-
motor
550
-
Stalen pijp
303
-
Kwartskristal
155
-
Rubber
111
-
rotor
104
-
Versterkte ijzeren plaat
27
-
Zwaar modulair frame
27
-
Siliciumdioxide
24
-
Kristaloscillator
16
-
AI-begrenzer
4
-
Hogesnelheidsverbinding
2
-
Bobbert - 27 mei 2023 19:52:41
No conflict with global rail networks and extremely low power requirement to get all the oil in the game to one singular location. All of the underground piping tunnels are accessible, but the whole "Refin Center" is completely underground which makes it a little harder to get the finished products to other factories.