

Cladding for water extractors, in just 4 easy steps.
How to do it:
- Place foundation roughly 1.5m above waterline.
- Hold pipeline junction at the middle of the foundation's edge, then nudge it 2m out, 0.5m to the right.
- Jump onto the junction and CTRL-place a water extractor on it. It will snap to the junction, which you can then delete.
- Hold blueprint onto edge of foundation, nudge it until it lines up with the water extractor.
Another can then be placed mirroring it, or they can be placed singly by deleting the bridge and pipes at the top. When placing many, you can CTRL-snap water extractor to an existing one, then nudge it 4m away, then place the blueprint on it and they should line up.
- Contagem de itens 88
- Categorias Architecture Exterior decorations Pipes system
- Classificação
- Versão da compilação 433.351
- Autor FugitiveHearts
- Transferir (5x) Transferir SBP Transferir configuração SBP
- Tamanho do ficheiro 11,05 KB
- Criado em 29/09/2025 13:24:42
- Última atualização em 29/09/2025 13:32:44
- Pré-visualização ao vivo (Alpha Test) See blueprint