Cladding for water extractors, in just 4 easy steps.
How to do it:
- Place foundation roughly 1.5m above waterline.
- Hold pipeline junction at the middle of the foundation's edge, then nudge it 2m out, 0.5m to the right.
- Jump onto the junction and CTRL-place a water extractor on it. It will snap to the junction, which you can then delete.
- Hold blueprint onto edge of foundation, nudge it until it lines up with the water extractor.
Another can then be placed mirroring it, or they can be placed singly by deleting the bridge and pipes at the top. When placing many, you can CTRL-snap water extractor to an existing one, then nudge it 4m away, then place the blueprint on it and they should line up.
- Liczba przedmiotów 88
- Kategorie Architecture Exterior decorations Pipes system
- Klasyfikacja
- Wersja kompilacji 433 351
- Autor FugitiveHearts
- Pobierz (110x) Pobierz SBP Pobierz konfigurację SBP
- Rozmiar pliku 11,05 KB
- Data utworzenia 29 wrz 2025, 13:24:42
- Ostatnia aktualizacja 29 wrz 2025, 13:32:44
- Podgląd na żywo (Alpha Test) See blueprint