Cladding for water extractors, in just 4 easy steps.
How to do it:
- Place foundation roughly 1.5m above waterline.
- Hold pipeline junction at the middle of the foundation's edge, then nudge it 2m out, 0.5m to the right.
- Jump onto the junction and CTRL-place a water extractor on it. It will snap to the junction, which you can then delete.
- Hold blueprint onto edge of foundation, nudge it until it lines up with the water extractor.
Another can then be placed mirroring it, or they can be placed singly by deleting the bridge and pipes at the top. When placing many, you can CTRL-snap water extractor to an existing one, then nudge it 4m away, then place the blueprint on it and they should line up.
- Кількість елементів 88
- Категорії Architecture Exterior decorations Pipes system
- Рейтинг
- Версія збірки 433 351
- Автор FugitiveHearts
- Завантажити (110x) Завантажити SBP Завантажити конфігурацію SBP
- Розмір файлу 11,05 KB
- Створено 29 вер. 2025 13:24:42
- Останнє оновлення 29 вер. 2025 13:32:44
- Попередній перегляд (Alpha Test) See blueprint