

Everything is made so nothing is clipping. Noob frendly with all Mark I Logistics (belts, splitters, and mergers).
Milestones Needed:
- Tier 0: HUB Upgrade 4
- Tier 1: Logiestics (MRK I)
Raw Cost Cost:
- 133 Iron Plates
- 8 Iron Rods
- מספר פריטים 19
- קטגוריות Interior decorations Exterior decorations UPDATE 7
- דירוג
- Build version 211,839
- מחבר The Blue Portal
- הורד (2,081x) Download SBP Download SBP Config
- File size 4.18 KB
- Created on 13 בנוב׳ 2023, 21:19:16
- Last updated on 13 בנוב׳ 2023, 21:28:38
- Live preview (Alpha Test) See blueprint