Everything is made so nothing is clipping. Noob frendly with all Mark I Logistics (belts, splitters, and mergers).
Milestones Needed:
- Tier 0: HUB Upgrade 4
- Tier 1: Logiestics (MRK I)
Raw Cost Cost:
- 133 Iron Plates
- 8 Iron Rods
- Items count 19
- Kategorier Interior decorations Exterior decorations UPDATE 7
- Rating
- Build version 211 839
- Author The Blue Portal
- Download (2 191x) Download SBP Download SBP Config
- File size 4,18 KB
- Created on 13 nov 2023 21:19:16
- Last updated on 13 nov 2023 21:28:38
- Live preview (Alpha Test) See blueprint