

Everything is made so nothing is clipping. Noob frendly with all Mark I Logistics (belts, splitters, and mergers).
Milestones Needed:
- Tier 0: HUB Upgrade 4
- Tier 1: Logiestics (MRK I)
Raw Cost Cost:
- 37 Iron Plates
- 4 Iron Rods
- 6 Ca
- Esineiden määrä 11
- Kategoriat Interior decorations Exterior decorations UPDATE 7
- Arvosana
- Ohjelmistoversio 211 839
- Tekijä The Blue Portal
- Lataa (2 087x) Download SBP Download SBP Config
- Tiedostokoko 3,1 KB
- Luotu 13.11.2023 21.30.04
- Last updated on 13.11.2023 21.32.05
- Live preview (Alpha Test) See blueprint