Everything is made so nothing is clipping. Noob frendly with all Mark I Logistics (belts, splitters, and mergers).
Milestones Needed:
- Tier 0: HUB Upgrade 4
- Tier 1: Logiestics (MRK I)
Raw Cost Cost:
- 37 Iron Plates
- 4 Iron Rods
- 6 Ca
- Items count 11
- Categories Interior decorations Exterior decorations UPDATE 7
- Rating
- Build version 211,839
- Author The Blue Portal
- Download (1,186x) Download SBP Download SBP Config
- File size 3.1 KB
- Created on Nov 13, 2023, 9:30:04 PM
- Last updated on Nov 13, 2023, 9:32:05 PM
- Live preview (Alpha Test) See blueprint