

Everything is made so nothing is clipping. Noob frendly with all Mark I Logistics (belts, splitters, and mergers).
Milestones Needed:
- Tier 0: HUB Upgrade 4
- Tier 1: Logiestics (MRK I)
Raw Cost Cost:
- 37 Iron Plates
- 4 Iron Rods
- 6 Ca
- Items count 11
- الفئات Interior decorations Exterior decorations UPDATE 7
- Rating
- Build version 211٬839
- Author The Blue Portal
- تحميل (2٬089x) Download SBP Download SBP Config
- File size 3٫1 KB
- Created on 13/11/2023 9:30:04 م
- Last updated on 13/11/2023 9:32:05 م
- Live preview (Alpha Test) See blueprint