MW

You need to underclock: 1 Biomass Burner at 6.667%.

Fuel input
Build Cost

You need to underclock: 1 Coal Generator at 2.667%.

Fuel input
Supplemental Load
Build Cost

You need to underclock: 1 Fuel Generator at 1.333%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 0.08%.

Fuel input
Supplemental Load