Iron Rod
Used for crafting.
One of the most basic parts.
- Category Standard Parts
- Stack size 200
- Resource Sink Points 4
Recipes
1
Iron Rod
( Constructor)
(15 / min)1x Iron Ingot
(15 / min)1x Iron Rod
Alternate recipes
1
Alternate: Steel Rod
( Constructor)
(12 / min)1x Steel Ingot
(48 / min)4x Iron Rod
Used to unlock
13
Cost | ||
---|---|---|
Base Building (Tier 1 / 120s) Unlocks: Lookout Tower, Foundation 1m, Foundation 2m, Foundation 4m, Ramp 1m, Ramp 2m, Ramp 4m, Basic Wall 4m, Basic Wall 1m |
200
100
100
|
|
Logistics (Tier 1 / 240s) Unlocks: Conveyor Splitter, Conveyor Merger, Conveyor Lift Mk.1 |
150
150
300
|
|
Part Assembly (Tier 2 / 360s) Unlocks: Assembler, Copper Sheet, Rotor, Modular Frame, Smart Plating |
200
200
500
300
|
|
Resource Sink Bonus Program (Tier 2 / 300s) Unlocks: AWESOME Sink, AWESOME Shop, Color Cartridge |
400
500
200
200
|
|
Logistics Mk.2 (Tier 2 / 360s) Unlocks: Conveyor Belt Mk.2, Stackable Conveyor Pole, Conveyor Lift Mk.2 |
50
200
300
300
|
|
Vehicular Transport (Tier 3 / 240s) Unlocks: Tractor, Truck Station, 3 Inventory Slot(s) |
25
100
200
400
|
|
Structural Analysis (3s) |
5
100
|
|
Slug Scanning (3s) |
50
100
200
|
|
HUB Upgrade 1 (Tier 0 / 0s) Unlocks: Equipment Workshop, Portable Miner, 3 Inventory Slot(s) |
10
|
|
HUB Upgrade 2 (Tier 0 / 0s) Unlocks: Smelter, Power Line, Copper Ingot, Wire, Cable |
20
10
|
|
HUB Upgrade 3 (Tier 0 / 0s) Unlocks: Constructor, Power Pole Mk.1, Concrete, Screw, Reinforced Iron Plate |
20
20
20
|
|
HUB Upgrade 5 (Tier 0 / 0s) Unlocks: Miner Mk.1, Storage Container, 3 Inventory Slot(s) |
75
50
20
|
|
HUB Upgrade 6 (Tier 0 / 0s) Unlocks: Space Elevator, Biomass Burner, Biomass (Wood), Biomass (Leaves) |
100
100
100
50
|
Used to craft
56
Input | Input rate | Output rate | Output | Produced in |
---|---|---|---|---|
Factory Cart™ |
||||
4x Iron Rod 2x Rotor |
||||
Golden Factory Cart™ |
||||
15x Caterium Ingot 4x Iron Rod 2x Rotor |
||||
Catwalk Crossing |
||||
2x Iron Rod 1x Iron Plate |
--- | |||
Catwalk Ramp |
||||
2x Iron Rod 1x Iron Plate |
1x Catwalk Ramp |
--- | ||
Catwalk Stairs |
||||
2x Iron Rod 1x Iron Plate |
--- | |||
Catwalk Straight |
||||
2x Iron Rod 1x Iron Plate |
--- | |||
Catwalk T-Crossing |
||||
2x Iron Rod 1x Iron Plate |
--- | |||
Catwalk Corner |
||||
2x Iron Rod 1x Iron Plate |
--- | |||
Conveyor Ceiling Mount |
||||
2x Iron Rod 2x Iron Plate 2x Concrete |
--- | |||
Conveyor Pole |
||||
1x Iron Rod 1x Iron Plate 1x Concrete |
--- | |||
Conveyor Wall Mount |
||||
2x Iron Rod 2x Iron Plate 2x Concrete |
--- | |||
Stackable Conveyor Pole |
||||
2x Iron Rod 2x Iron Plate 2x Concrete |
--- | |||
Conveyor Merger |
||||
2x Iron Plate 2x Iron Rod |
--- | |||
Power Pole Mk.1 |
||||
3x Wire 1x Iron Rod 1x Concrete |
--- | |||
Wall Outlet Mk.1 |
||||
4x Wire 1x Iron Rod |
--- | |||
Power Pole Mk.2 |
||||
6x Quickwire 2x Iron Rod 2x Concrete |
--- | |||
Double Wall Outlet Mk.1 |
||||
8x Wire 2x Iron Rod |
--- | |||
Double Wall Outlet Mk.2 |
||||
16x Quickwire 4x Iron Rod |
--- | |||
Wall Outlet Mk.2 |
||||
8x Quickwire 2x Iron Rod |
--- | |||
Craft Bench |
||||
3x Iron Plate 3x Iron Rod |
1x Craft Bench |
--- | ||
Industrial Railing |
||||
4x Iron Rod |
--- | |||
Walkway Crossing |
||||
2x Iron Rod 1x Iron Plate |
--- | |||
Walkway Ramp |
||||
2x Iron Rod 1x Iron Plate |
1x Walkway Ramp |
--- | ||
Walkway Straight |
||||
2x Iron Rod 1x Iron Plate |
--- | |||
Walkway T-Crossing |
||||
2x Iron Rod 1x Iron Plate |
--- | |||
Walkway Turn |
||||
2x Iron Rod 1x Iron Plate |
1x Walkway Turn |
--- | ||
Pipeline Wall Support |
||||
2x Iron Rod 1x Iron Plate 2x Concrete |
--- | |||
Modular Frame |
||||
12x Iron Rod |
(
3 / min
)
(
12 / min
)
|
(
2 / min
)
|
||
Rotor |
||||
5x Iron Rod 25x Screw |
(
20 / min
)
(
100 / min
)
|
(
4 / min
)
|
1x Rotor |
|
Stackable Pipeline Support |
||||
4x Iron Plate 2x Iron Rod 2x Concrete |
--- | |||
Stackable Hypertube Support |
||||
4x Iron Plate 2x Iron Rod 2x Concrete |
--- | |||
Personal Storage Box |
||||
6x Iron Plate 6x Iron Rod |
--- | |||
Lookout Tower |
||||
5x Iron Plate 5x Iron Rod |
--- | |||
Modern Railing |
||||
2x Iron Rod |
--- | |||
Ladder |
||||
2x Iron Rod |
1x Ladder |
--- | ||
Pipeline Wall Hole |
||||
2x Iron Rod 1x Iron Plate 2x Concrete |
--- | |||
Pipeline Floor Hole |
||||
2x Iron Rod 2x Iron Plate 2x Concrete |
--- | |||
Street Light |
||||
10x Quickwire 4x Wire 4x Iron Rod |
1x Street Light |
--- | ||
Medical Storage Box |
||||
6x Iron Plate 6x Iron Rod |
--- | |||
Hypertube Floor Hole |
||||
2x Iron Rod 2x Iron Plate 2x Concrete |
--- | |||
Hazard Storage Box |
||||
6x Iron Plate 6x Iron Rod |
--- | |||
Conveyor Lift Floor Hole |
||||
2x Iron Rod 2x Iron Plate 2x Concrete |
--- | |||
Biomass Burner |
||||
15x Iron Plate 15x Iron Rod 25x Wire |
--- | |||
Space Elevator |
||||
500x Concrete 250x Iron Plate 400x Iron Rod 1,500x Wire |
||||
Storage Container |
||||
10x Iron Plate 10x Iron Rod |
--- | |||
Screw |
||||
1x Iron Rod |
(
10 / min
)
|
(
40 / min
)
|
4x Screw |
|
Smelter |
||||
5x Iron Rod 8x Wire |
1x Smelter |
--- | ||
Equipment Workshop |
||||
6x Iron Plate 4x Iron Rod |
--- | |||
Xeno-Zapper |
||||
10x Iron Rod 15x Cable 50x Wire |
1x Xeno-Zapper |
|||
Chainsaw |
||||
25x Iron Rod 160x Screw 15x Cable |
1x Chainsaw |
|||
Beacon |
||||
3x Iron Plate 1x Iron Rod 15x Wire 2x Cable |
(
22.5 / min
)
(
7.5 / min
)
(
112.5 / min
)
(
15 / min
)
|
(
7.5 / min
)
|
1x Beacon |
|
Iron Rebar |
||||
1x Iron Rod |
(
15 / min
)
|
(
15 / min
)
|
1x Iron Rebar |
|
Rebar Gun |
||||
16x Iron Rod 100x Screw |
1x Rebar Gun |
|||
Zipline |
||||
1x Xeno-Zapper 30x Quickwire 3x Iron Rod 10x Cable |
1x Zipline |
|||
Portable Miner |
||||
2x Iron Plate 4x Iron Rod |
||||
Alternate: Automated Miner |
||||
1x Motor 4x Steel Pipe 4x Iron Rod 2x Iron Plate |