You need to overclock: 2 Biomass Burner at 250%.

Fuel input
Build Cost

You need to overclock: 2 Coal Generator at 250%.

You need to underclock: 1 Coal Generator at 20%.

Fuel input
Supplemental Load
Build Cost

You need to overclock: 1 Fuel Generator at 250%.

You need to underclock: 1 Fuel Generator at 10%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 15.6%.

Fuel input
Supplemental Load