You need to overclock: 1 Biomass Burner at 250%.

You need to underclock: 1 Biomass Burner at 96.667%.

Fuel input
Build Cost

You need to overclock: 1 Coal Generator at 138.667%.

Current result shows a 104MW power output.
Fuel input
Supplemental Load
Build Cost

You need to underclock: 1 Fuel Generator at 69.333%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 4.16%.

Fuel input
Supplemental Load