You need to overclock: 1 Biomass Burner at 200%.

You need to underclock: 1 Biomass Burner at 33.333%.

Fuel input
Build Cost

You need to overclock: 1 Coal Generator at 200%.

You need to underclock: 1 Coal Generator at 73.333%.

Fuel input
Supplemental Load
Build Cost

You need to overclock: 1 Fuel Generator at 200%.

You need to underclock: 1 Fuel Generator at 86.667%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 23.2%.

Fuel input
Supplemental Load