You need to overclock: 4 Biomass Burner at 250%, 1 Biomass Burner at 133.333%.

Fuel input
Build Cost

You need to underclock: 1 Coal-Powered Generator at 53.333%.

Fuel input
Supplemental Load
Build Cost

You need to underclock: 1 Fuel-Powered Generator at 36%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 13.6%.

Fuel input
Supplemental Load