

Requires 23 power shards and used ~570 MW to make enough fuel for 5 reactors, netting ~11,500 MW depending on miners and water extractors All vanilla. Open design. Mk2 max belt. Distribution floor coming soon. Please leave a comment on any issues with efficiency as I have not done a full load test.
Inputs: Limestone 120/min Uranium 100/min Copper 80/min Caterium 60/min Sulfur 60/min Water 60/min Iron 54.75/min Coal 54.75/min
- Öğe Sayısı 181
- Kategoriler Complete factory
- Değerlendirme
- İnşa Sürümü 273.254
- Eser Sahibi Oak_
- İndir (2.305x) SBP İndir SBP Konfigürasyonu İndir
- Dosya boyutu 32,2 KB
- Oluşturma tarihi 9 Oca 2024 20:19:27
- Son Güncelleme 9 Oca 2024 20:37:09
- Canlı önizleme (Alpha Test) See blueprint