Stackable, powered, lit and signage on entry and exit points. You need to add the elevators to the sides to connect the excess incoming mats to the input on top floor as the blueprint is too small to add these in.
Should be able to easily stack on top of each other, just add the elevators to connect the Excess Materials to the Incoming Materials hole.
- Öğe Sayısı 388
- Kategoriler Complete factory
- Değerlendirme
- İnşa Sürümü 210.924
- Eser Sahibi macster
- İndir (6.279x) SBP İndir SBP Konfigürasyonu İndir
- Dosya boyutu 28,4 KB
- Oluşturma tarihi 3 Ara 2022 19:28:19
- Son Güncelleme 3 Ara 2022 19:29:08
- Canlı önizleme (Alpha Test) See blueprint