Stackable, powered, lit and signage on entry and exit points. You need to add the elevators to the sides to connect the excess incoming mats to the input on top floor as the blueprint is too small to add these in.
Should be able to easily stack on top of each other, just add the elevators to connect the Excess Materials to the Incoming Materials hole.
- Antal genstande 388
- Kategorier Complete factory
- Bedømmelse
- Version 210.924
- Skaber macster
- Hent (6.279x) Hent SBP Hent SBP-konfiguration
- Filstørrelse 28,4 KB
- Skabt den 03/12/2022 19.28.19
- Sidst opdateret den 03/12/2022 19.29.08
- Direkte forhåndsvisning (Alpha Test) See blueprint