Train Bridge Middle Segment

You need to set it on a foundation, it has 2 4-meter foundations on it you need to delete afterward. They're a help to connect with the pillor segmnet. Design has on one side Hypertube support, on both side electric cable connection (bit hidden) and lights only on at night. It is made for 2 lanes. Enjoy!

  • Created on 28 dec 2022 02:56:27
  • Last updated on 28 dec 2022 03:11:31