Train Bridge Middle Segment

You need to set it on a foundation, it has 2 4-meter foundations on it you need to delete afterward. They're a help to connect with the pillor segmnet. Design has on one side Hypertube support, on both side electric cable connection (bit hidden) and lights only on at night. It is made for 2 lanes. Enjoy!

  • Skabt den 28/12/2022 02.56.27
  • Sidst opdateret den 28/12/2022 03.11.31