Steel Beam
Primarily used when constructing slightly more advanced buildings.
- Category Standard Parts
- Stack size 200
- Resource Sink Points 64
Recipes
1
Steel Beam
Alternate recipes
2
Alternate: Aluminum Beam
Alternate: Molded Beam
Used to unlock
8
| Cost | ||
|---|---|---|
| Expanded Power Infrastructure (Tier 4 / 300s) Unlocks: |
||
| FICSIT Blueprints (Tier 4 / 300s) Unlocks: |
||
| Logistics Mk.3 (Tier 4 / 300s) Unlocks: Conveyor Belt Mk.3, Conveyor Lift Mk.3, Stackable Pipeline Support |
||
| Fluid Packaging (Tier 5 / 300s) Unlocks: Packaged Oil, Packaged Heavy Oil Residue, |
||
| Monorail Train Technology (Tier 6 / 600s) Unlocks: Electric Locomotive, Freight Car, Railway, |
||
![]() |
Expanded Toolbelt (3s) Unlocks: 1 Equipment Slot(s) |
|
| Power Switch (3s) Unlocks: |
||
| Explosive Rebar (3s) Unlocks: |
Used to craft
104
| Input | Input rate | Output rate | Output | Produced in |
|---|---|---|---|---|
Freight Car |
||||
10x 10x |
1x Freight Car |
--- | ||
Inverted Quarter Pipe |
||||
5x 2x |
--- | |||
Inverted Inner Corner Quarter Pipe |
||||
5x 2x |
--- | |||
Inverted Outer Corner Quarter Pipe |
||||
5x 2x |
--- | |||
Foundation (1 m) |
||||
5x 2x |
--- | |||
Foundation (2 m) |
||||
5x 2x |
--- | |||
Foundation (4 m) |
||||
5x 2x |
--- | |||
Inverted Down Corner (1 m) |
||||
5x 2x |
--- | |||
Inverted Down Corner (2 m) |
||||
5x 2x |
--- | |||
Inverted Down Corner (4 m) |
||||
5x 2x |
--- | |||
Inverted Ramp (1 m) |
||||
5x 2x |
--- | |||
Inverted Ramp (2 m) |
||||
5x 2x |
--- | |||
Inverted Ramp (4 m) |
||||
5x 2x |
--- | |||
Inverted Up Corner (1 m) |
||||
5x 2x |
--- | |||
Inverted Up Corner (2 m) |
||||
5x 2x |
--- | |||
Inverted Up Corner (4 m) |
||||
5x 2x |
--- | |||
Quarter Pipe |
||||
5x 2x |
1x |
--- | ||
Inner Corner Quarter Pipe |
||||
5x 2x |
--- | |||
Half Foundation (1 m) |
||||
5x 2x |
--- | |||
Half Foundation (2 m) |
||||
5x 2x |
--- | |||
Half Foundation (4 m) |
||||
5x 2x |
--- | |||
Inner Corner Extension (1 m) |
||||
5x 2x |
--- | |||
Inner Corner Extension (2 m) |
||||
5x 2x |
--- | |||
Inner Corner Extension (4 m) |
||||
5x 2x |
--- | |||
Outer Corner Extension (1 m) |
||||
5x 2x |
--- | |||
Outer Corner Extension (2 m) |
||||
5x 2x |
--- | |||
Outer Corner Extension (4 m) |
||||
5x 2x |
--- | |||
Outer Corner Quarter Pipe |
||||
5x 2x |
--- | |||
Down Corner Ramp (1 m) |
||||
5x 2x |
--- | |||
Down Corner Ramp (2 m) |
||||
5x 2x |
--- | |||
Down Corner Ramp (4 m) |
||||
5x 2x |
--- | |||
Ramp (1 m) |
||||
5x 2x |
1x |
--- | ||
Ramp (2 m) |
||||
5x 2x |
1x |
--- | ||
Ramp (4 m) |
||||
5x 2x |
1x |
--- | ||
Up Corner Ramp (1 m) |
||||
5x 2x |
--- | |||
Up Corner Ramp (2 m) |
||||
5x 2x |
--- | |||
Up Corner Ramp (4 m) |
||||
5x 2x |
--- | |||
Double Ramp (2 m) |
||||
5x 2x |
--- | |||
Double Ramp (4 m) |
||||
5x 2x |
--- | |||
Double Ramp (8 m) |
||||
5x 2x |
--- | |||
Foundation Stairs (1 m) |
||||
5x 2x |
--- | |||
Foundation Stairs (2 m) |
||||
5x 2x |
--- | |||
Foundation Stairs (4 m) |
||||
5x 2x |
--- | |||
Frame Floor |
||||
2x 2x |
1x |
--- | ||
Frame Foundation |
||||
5x 2x |
--- | |||
Glass Frame Foundation |
||||
2x 5x 2x |
--- | |||
Roll-Up Gate |
||||
4x 4x |
1x |
--- | ||
Gate Hole Wall |
||||
2x 2x |
--- | |||
Single Window |
||||
2x 2x |
--- | |||
Reinforced Window |
||||
2x 2x |
--- | |||
Frame Window |
||||
2x 2x |
1x |
--- | ||
Panel Window |
||||
2x 2x |
1x |
--- | ||
Tilted Corner Wall (4 m) |
||||
2x 2x |
--- | |||
Tilted Concave Wall (4 m) |
||||
2x 2x |
--- | |||
Tilted Corner Wall (8 m) |
||||
2x 2x |
--- | |||
Tilted Concave Wall (8 m) |
||||
2x 2x |
--- | |||
Frame Wall |
||||
2x |
1x |
--- | ||
Angled Frame Window |
||||
2x 2x |
--- | |||
Honeycomb Frame Window |
||||
2x 2x |
--- | |||
Triple Frame Window |
||||
2x 2x |
--- | |||
Full Frame Window |
||||
2x 2x |
--- | |||
Hex Frame Window |
||||
2x 2x |
--- | |||
Flat Roof |
||||
3x 2x |
1x |
--- | ||
Roof (1 m) |
||||
3x 2x |
1x |
--- | ||
Roof (2 m) |
||||
3x 2x |
1x |
--- | ||
Roof (4 m) |
||||
3x 2x |
1x |
--- | ||
Inner Corner Roof (1 m) |
||||
3x 2x |
--- | |||
Inner Corner Roof (2 m) |
||||
3x 2x |
--- | |||
Inner Corner Roof (4 m) |
||||
3x 2x |
--- | |||
Outer Corner Roof (1 m) |
||||
3x 2x |
--- | |||
Outer Corner Roof (2 m) |
||||
3x 2x |
--- | |||
Outer Corner Roof (4 m) |
||||
3x 2x |
--- | |||
Braided Cable |
||||
1x |
--- | |||
Braided Cable Cluster |
||||
1x |
--- | |||
H-Beam |
||||
1x |
1x |
--- | ||
Shelf Beam |
||||
1x |
1x |
--- | ||
Metal Beam |
||||
1x |
1x |
--- | ||
Painted Beam |
||||
1x |
1x |
--- | ||
Small Frame Pillar |
||||
3x |
--- | |||
Big Frame Pillar |
||||
5x |
--- | |||
Conveyor Belt Mk.3 |
||||
1x |
--- | |||
Conveyor Lift Mk.3 |
||||
2x |
--- | |||
Valve |
||||
4x 4x |
1x |
--- | ||
Versatile Framework |
||||
12x |
(
2.5 / min
)
(
30 / min
)
|
(
5 / min
)
|
||
Packager |
||||
20x 10x 10x |
1x |
--- | ||
Encased Industrial Beam |
||||
3x 6x |
(
18 / min
)
(
36 / min
)
|
(
6 / min
)
|
||
Plutonium Fuel Rod |
||||
18x 10x |
(
7.5 / min
)
(
4.5 / min
)
(
1.5 / min
)
(
2.5 / min
)
|
(
0.25 / min
)
|
||
Resource Well Extractor |
||||
10x 10x |
--- | |||
Railway |
||||
1x 1x |
1x Railway |
--- | ||
Industrial Storage Container |
||||
20x 20x |
--- | |||
Blueprint Designer Mk.1 |
||||
15x 25x 100x 100x |
--- | |||
Hypertube Junction |
||||
2x 5x |
--- | |||
Power Tower |
||||
10x 20x 20x |
1x |
--- | ||
Power Tower Platform |
||||
10x 20x 20x |
--- | |||
Priority Power Switch |
||||
6x 50x |
--- | |||
Power Switch |
||||
20x 4x 1x |
1x |
--- | ||
Frame Ramp |
||||
5x |
1x |
--- | ||
Inverted Frame Ramp |
||||
5x |
--- | |||
Ceiling Light |
||||
50x 16x 6x |
--- | |||
Elevator Floor Stop |
||||
1x 5x |
--- | |||
Personnel Elevator |
||||
1x 1x |
--- | |||
Nobelisk Detonator |
||||
10x 50x |
||||
Alternate: Flexible Framework |
||||
6x 8x |
(
3.75 / min
)
(
22.5 / min
)
(
30 / min
)
|
(
7.5 / min
)
|
||
Alternate: Steel Screws |
||||
1x |
(
5 / min
)
|
(
260 / min
)
|
52x |
|
Conveyor Belt Mk.3
Conveyor Lift Mk.3
Stackable Pipeline Support
Packaged Oil
Packaged Heavy Oil Residue
Electric Locomotive
Freight Car
Railway