Swamp Advanced Computer Factory
Multi-product factory in the east swamplands and plateau north of the swamplands.
Requirements:
Note that because of the high level products being produced, there are a high number of dependencies with my other megaprints:
- Swamp Resources https://satisfactory-calculator.com/megaprints/index/details/id/1349/name/Swampland+Infrastructure%2FResources
- East Forest Radio Factory https://satisfactory-calculator.com/megaprints/index/details/id/1463/name/Eastern+Forest+Radio+Factory
- Grassfields Oscillator Factory https://satisfactory-calculator.com/megaprints/index/details/id/35/name/Grassfields+Oscillator+Related+Products+Factory
Required materials are delivered by train. If you don't want to use the above megaprints, please deliver via train Radios and Quantum Oscillators.
Logistics
After pasting my Swamp Resources megaprint, connect the power connectors, belts and pipes under the main road between the swamp buildings. Connect the transmission pylons to the buildings on the plateau.
Production:
Cooling Systems Building
- Cooling Device blenders x 12
- Heat Sink assemblers x 6
- Heat Exchanger assemblers x 11
- Alclad Casings assemblers x 3
- Alclad Aluminium Sheet assemblers x 8
- AI Limiter assemblers x 2
- Fused Quickwire assemblers x 2
- Copper sheet constructors x 20
Motor Building
- Motor assemblers x 6
- Control Rod assemblers x 2
- Stator assemblers x 14
- Steel Rotor assemblers x 12
- Fused Wire assemblers x 12
Versatile Framework Building
- Versatile Framework assemblers x 3
- Bolted Frame assemblers x 2
- Reinforced Iron Plate x 3
- Iron Plate constructors x 4
- Cast Screw constructors x 8
Magnetic Generator Building
- Magnetic Field Generator assemblers x 6
- OC Supercomputer assemblers x 6
Quantum Encoder Building
- Excited Photonic Matter converters x 3
- AI Expansion Server encoders x 3
- Neural-Quantum Processor encoder x 4
Singularity Cell Building
This is the building on the north plateau, and is used to sink excess dark matter by converting it into crystals. If you want to use it to produce Singularity Cells, you will need to supply Nuclear Pasta via drone.
Modded Content:
Please note that I use oversized pieces in this blueprint.
Version History
- V2.0 Now fixed for update 4.
- V3.0 Fixed for update 6 map.
- V3.1 Replaced floors under manufacturers / assemblers with normal sized pieces. Removed AI limiters from production to allow for more radio control units. Minor conveyor balancing improvements.
- V3.2 Fixed conveyor lift to adaptive control units, thanks to comment feedback below.
- V4.0 Moved circuit tower into the swamp, now part of this blueprint.
- V5.0 Retooled for advanced computer products in Release 1.0 version
- Antall gjenstander 10 044
- Koordinater 267 000 / −26 500
- Lim inn på originalstedet Yes
- Kategorier Architecture Interior decorations Exterior decorations Pipes system Tracks system Modded Stable (1.0)
-
Vurdering
4 / 5
- Spillversjon 385 279
- Forfatter xbb1024
- Last ned (7 894x) Last ned
- Filstørrelse 1٫02 MB
- Lastet opp den 26. nov. 2020, 07:05:58
- Sist oppdatert den 3. mar. 2025, 09:30:30
-
FICSIT-fundament 1m
1 065
-
Skråstilt FICSIT-vegg 8m
946
-
Strømlinje
762
-
Standard FICSIT-vegg 4m
676
-
Vindu med poster i stålvegg
539
-
Transportbånd Mk.3
453
-
Transportbåndheis Mk.1
408
-
Halvt FICSIT-fundament 1m
327
-
FICSIT-fundament 1m
297
-
Transportbånd-splitter
265
-
Veggpol Mk.1
221
-
Transportbåndheis Mk.3
212
-
Transportbånd-samler
205
-
Vindu med poster i stålvegg
197
-
Transportbåndheis Mk.2
152
-
Standard FICSIT-vegg 1m
148
-
Plattformtrapp
147
-
Taklampe
138
-
Transportbånd Mk.5
137
-
Gulvhull for transportbåndheis
134
-
Transportbåndstolpe
132
-
Standard metallvegg 4m
101
-
Montør
98
-
Stor betongpilar
90
-
Sprossevindu i stålvegg
88
-
Transportbånd Mk.4
79
-
Båndstøtte for himling
77
-
Rørledning Mk.1
77
-
Konstruktør
67
-
Gatelys
65
-
Transportbåndheis Mk.5
65
-
FICSIT-fundament 2m
61
-
Rørledning Mk.2
54
-
FICSIT-fundament 4m
53
-
Rørkryss
52
-
Industrielt rekkverk
51
-
Togskinne
48
-
Rammegulv
45
-
Plattformhjørne
42
-
Transportbånd Mk.1
38
-
Transportbåndheis Mk.4
38
-
Rammefundament
35
-
Transportbånd Mk.2
29
-
Firkantet skilt 0,5m
28
-
FICSIT-fundament 1m
27
-
Stålvegg med dør midt i
26
-
Stort enkeltvindu i stålvegg
24
-
Sprossevindu i stålvegg
24
-
Stålvegg med dør til siden
24
-
Smeltere
24
-
Halvt FICSIT-fundament 4m
23
-
Flatt metalltak
18
-
FICSMAS-snødispenser
18
-
Industriell lagringsconteiner
18
-
Rørledningstøtte for vegg
18
-
Strømstolpe Mk.1
18
-
Strømbryter
18
-
Tittelskilt 3m
17
-
Standard FICSIT-vegg 4m
16
-
Invertert triangel-FICSIT-vegg 8m
15
-
Seksjonssignal
15
-
Glassramme-fundament
13
-
Platform rett
13
-
Strømstolpe Mk.2
13
-
Platform T-kryss
12
-
Portrettskilt
12
-
Blander
12
-
Hyperrørvegghull
12
-
Hyperrørinngang
12
-
Hyperrør
12
-
Halvt FICSIT-fundament 1m
11
-
Malt bjelke
11
-
Transportbånd-FICSIT-vegg x3
11
-
Halvt FICSIT-fundament 2m
10
-
Invertert FICSIT-rampe 1m
10
-
Transportbånd-FICSIT-vegg x1
10
-
Moderne rekkverk
10
-
Firkantet skilt 1m
10
-
Liten betongpilar
9
-
Triangel-FICSIT-vegg 4m
9
-
Triangel-FICSIT-vegg 8m
9
-
Platform kryss
9
-
Stige
9
-
Kontainerterminal
9
-
FICSIT-fundament 1m
8
-
Invertert oppgående FICSIT-hjørnerampe 1m
8
-
Stålbjelke
8
-
Raffineri
8
-
Invertert oppgående FICSIT-hjørnerampe 1m
7
-
Metalltak 1m
7
-
Borerigg Mk.3
7
-
Vannsamler
7
-
Båndstøtte for vegg
7
-
Rørledningstolpe
7
-
Skinnevalgsignal
7
-
Halvt FICSIT-fundament 1m
6
-
Automatisert port
6
-
Produsent
6
-
Gulvhull for rørledning
6
-
Hyperrørgulvhull
6
-
Invertert triangel-FICSIT-vegg 4m
5
-
Skråstilt konkav vegg 4m
5
-
Tittelskilt 4m
5
-
Togskinne-sporveksler
5
-
FICSIT-fundament 1m
4
-
Dobbel FICSIT-rampe 2m
4
-
Kontrollpanel for lys
4
-
Triangel-FICSIT-vegg 2m
4
-
Transportbånd-FICSIT-vegg x2
4
-
Plattformrampe
4
-
Partikkelakselerator
4
-
Droneplatform
4
-
Nedgående FICSIT-hjørnerampe 1m
3
-
FICSIT-rampe 1m
3
-
Dobbel FICSIT-rampe 2m
3
-
Geotermisk generator
3
-
Smartsplitter
3
-
Rørledningshull i vegg
3
-
Jernbanestasjon
3
-
Flatt metalltak
2
-
Metalltak 1m
2
-
Flatt metalltak
2
-
Metalltak 1m
2
-
Liten rammepilar
2
-
Triangel-FICSIT-vegg 1m
2
-
Stålvegg med portåpning
2
-
Visningsskilt
2
-
EKSPERT-butikk
2
-
Personlig oppevaringsboks
2
-
Stabelbar båndstøtte
2
-
Oppgående FICSIT-hjørnerampe 1m
1
-
Invertert nedgående FICSIT-hjørnerampe 1m
1
-
Invertert nedgående FICSIT-hjørnerampe 4m
1
-
Veggmontert flomlys
1
-
Stor metallpilar
1
-
Bjelketilkobling
1
-
Triangel-FICSIT-vegg 1m
1
-
Veibarriere
1
-
Stor reklametavle
1
-
EKSPERT-kvern
1
-
Arbeidsbenk
1
-
Utstyrsverksted
1
-
Radartårn
1
-
Lastebilstasjon
1
-
Tom plattform med gangbro med moderne rekkverk
1
-
Kraftmast
1
-
Betong
15 766
-
Kvikktråd
8 141
-
Kabel
3 648
-
Kobbertråd
3 618
-
Jernplate
2 854
-
Stålbjelke
2 540
-
Jernstav
2 440
-
Faktisk snø
1 800
-
Silika
1 744
-
Forsterket jernplate
1 424
-
Stålrør
1 213
-
Kobbertynnplate
923
-
Aluminiumkabinet
800
-
Rotor
536
-
Korrosjonsbestandig aluminiumsplate
467
-
Tung modulær ramme
410
-
Skruer
400
-
Elektromagnetisk kontrollstav
400
-
Motor
395
-
Plast
354
-
Innkapslet Stålbjelke
297
-
Kvartskrystall
279
-
Gummi
240
-
Kjølesystem
200
-
Radiokontrollenhet
200
-
Sukkerstang
180
-
Høyhastighetstilkobling
167
-
Sammensveiset modulær ramme
150
-
Superdatamaskin
99
-
Turbomotor
61
-
Datamaskin
49
-
Kretskort
40
-
FICSMAS-krans
36
-
Krystalloscillator
35
-
KI-begrense
33
-
Bærbar graver
21
-
Modulær ramme
15
-
Holden486 - 4. jul. 2024, 20:36:57
cool building designs, but overall very inefficient due to no use of overclocking. you'd save a vast amount of space, machines, and frame rate reduction by overclocking buildings. hope you make some efficient setups in future
-
NeoMod - 23. apr. 2024, 17:08:34
Beautiful Building! If only it wasn't conflicting with the global rail network...
-
xbb1024 - 28. mar. 2023, 16:01:15
Hi everyone, sorry I've been away from the game for a bit. I'll look into making the fixes in my megaprint
-
jneal - 12. mar. 2023, 16:38:42
I ended up raising this up with the calculator and converting it to use Rail way stations for all the input, makes it easier to bring material in from the map. Right now I have it working with all the rail stations all to the side, but I am working on moving them underneath to look nicer. Fixed a few bugs and adding more signs but this is a awesome build that you did. Once I am finished I can send you a copy if you want. I found out how to resize the pieces and I am converting some it to regular vanilla.
-
jneal - 22. feb. 2023, 05:07:31
what mod is used for the oversized pieces?
-
RipTheJacker - 21. feb. 2023, 13:42:32
@xbb1024 Great work, I really love your factories. However, as pointed out before, there is an error on 9th floor with rubber beeing used instead of circuit boards. It can easily be fixed with a little re-routing. But, there isnt enough circuit boards beeing made to cover it all. Do you have any suggestion or are you working on a fix?
-
dak4482 - 9. feb. 2023, 22:07:42
Found one major error. On the 9th floor you have rubber being input to the adaptive control unit manufacturers instead of circuit boards. Definitely needs to be fixed.
-
dak4482 - 30. jan. 2023, 22:12:38
Alot of lower level stuff goes below ground and cant be connected!!! This blueprint should be raised up AT LEAST 10 meters when placed. Or relocated where the landscape doesnt swallow up the lower level. Needs to be on LEVEL ground!!!!
-
dak4482 - 23. jan. 2023, 20:09:36
I am hopelessly lost with this building. How do you get the products to the drones or out of the building???? NOTHING is labeled. The conveyors fro,m the back of the drones dead end at the inside wall. What do you connect those to??? There are conveyor connections on the walls of the interior shaft but again no labels and no connections that I can see to the production machines. HEEEELLLPPP!!!!
-
Novoca1n3 - 20. nov. 2022, 02:29:58
Looks like a great factory however shame you're using mods.
-
xbb1024 - 8. nov. 2022, 13:56:30
Power inputs to the building are under the path going into the entrance (you will see 3 of them)
-
Ventah - 4. nov. 2022, 13:57:52
I really like this design, but I can't figure out where to connect the power. I powered the train station and hoped this will be enough but apparently somewhere else is a connection required. Can anyone tell me where?
-
xbb1024 - 10. okt. 2022, 01:55:11
I started using resizing as a way to get my blueprints / save file smaller, when I made this one I didn't really consider how hard it would be to alter. I'll keep the floor under machines normal for future blueprints.
-
kammerkoenig - 6. okt. 2022, 16:49:23
Had an issue with one wrong connection with rubber in the computer production (not sure anymore where it was) but still a nice build :D, but yes modification is difficult with the oversized pieces
-
Heathwing22 - 29. aug. 2022, 21:22:39
Beautiful Building.....BUT oversized pieces make it impossible to add anything or change anything. I gave up on it.....