

A hypertube 3-way-junction you can remotely control with the priority power switch. 150MW
Routing (Power on): 1-2, 2- 3, 3-1 Routing(Power off): 1-3, 3-2, 2- 1
The priority power switch is already integrated and has the name 'junction'. Just place down another one whereever you like and use it as a remote control.
This is the improved version of my prior design (https://satisfactory-calculator.com/en/blueprints/index/details/id/3839/name/Remote-controlled+3-way-junction). It takes less space and does not slow you down anymore.
- Antall gjenstander 115
- Kategorier Architecture UPDATE 8
- Vurdering
- Spillversjon 249 836
- Forfatter Fredmi
- Last ned (87x) Last ned SBP Last ned SBP konfigurasjonfil
- Filstørrelse 12٫63 KB
- Lastet opp den 8. okt. 2023, 11:32:38
- Sist oppdatert den 8. okt. 2023, 11:35:33
- Se som 3D-model (Alpha Test) See blueprint