

A hypertube 3-way-junction you can remotely control with the priority power switch. 150MW
Routing (Power on): 1-2, 2- 3, 3-1 Routing(Power off): 1-3, 3-2, 2- 1
The priority power switch is already integrated and has the name 'junction'. Just place down another one whereever you like and use it as a remote control.
This is the improved version of my prior design (https://satisfactory-calculator.com/en/blueprints/index/details/id/3839/name/Remote-controlled+3-way-junction). It takes less space and does not slow you down anymore.
- Items count 115
- Categories Architecture UPDATE 8
- Rating
- Build version 249,836
- Author Fredmi
- Download (73x) Download SBP Download SBP Config
- File size 12.63 KB
- Created on Oct 8, 2023, 11:32:38 AM
- Last updated on Oct 8, 2023, 11:35:33 AM
- Live preview (Alpha Test) See blueprint