

3:4 Load balancer
Everything is made so nothing is clipping. Noob frendly with all Mark I Logistics (belts, splitters, and mergers).
Milestones Needed:
- Tier 0: HUB Upgrade 4
- Tier 1: Logiestics (MRK I)
Raw Cost Cost:
- 133 Iron Plates
- 8 Iron Rods
- 18 Cables
- Items count 37
- Kategóriák Interior decorations Exterior decorations UPDATE 7
- Értékelés
- Build version 211 839
- Author The Blue Portal
- Letöltés (2 251x) Download SBP Download SBP Config
- Fájlméret 8,14 KB
- Created on 2023. nov. 13. 16:46:50
- Last updated on 2023. nov. 13. 16:54:46
- Live preview (Alpha Test) See blueprint