3:4 Load balancer
Everything is made so nothing is clipping. Noob frendly with all Mark I Logistics (belts, splitters, and mergers).
Milestones Needed:
- Tier 0: HUB Upgrade 4
- Tier 1: Logiestics (MRK I)
Raw Cost Cost:
- 133 Iron Plates
- 8 Iron Rods
- 18 Cables
- Items count 37
- Categories Interior decorations Exterior decorations UPDATE 7
- Rating
- Build version 211,839
- Author The Blue Portal
- Download (1,348x) Download SBP Download SBP Config
- File size 8.14 KB
- Created on Nov 13, 2023, 4:46:50 PM
- Last updated on Nov 13, 2023, 4:54:46 PM
- Live preview (Alpha Test) See blueprint