

Output:
- Plastic 300/min
- Rubber 600/min
Input
- Crude Oil 300/min
- 2037.6 MW
Size: 6.5x6 foundations
Notes:
Stacked
- do not modify any machines/logistics or the print will no longer function.- HOR prefill valve located next to HOR refinery, drastically shortens startup time.
- Plastic output is completely gated through a smart splitter, therefore little to no plastic will be output until the rubber production manifold is full.
- Rubber output is only partially gated through a smart splitter as the total rubber production is greater than 780/min, thus rubber will start to flow somewhat immediately.
- No mods required for use
- Schematic used: https://www.satisfactorytools.com/1.0/production?share=sq6wCQ8V8BlJLpdKJ5uR
- Nombre d'objets 673
- Catégories Complete factory Stable (1.0)
- Évaluation
- Version 385 279
- Auteur x4077
- Télécharger (244x) Télécharger le SBP Télécharger la configuration SBP
- Taille du fichier 98,6 KB
- Réalisé avec 27 févr. 2025 04:45:51
- Dernière mise à jour le 6 juin 2025 07:24:20
- Prévisualisation en direct (Alpha Test) See blueprint