

Output:
- Plastic 300/min
- Rubber 600/min
Input
- Crude Oil 300/min
- 2037.6 MW
Size: 6.5x6 foundations
Notes:
Stacked
- do not modify any machines/logistics or the print will no longer function.- HOR prefill valve located next to HOR refinery, drastically shortens startup time.
- Plastic output is completely gated through a smart splitter, therefore little to no plastic will be output until the rubber production manifold is full.
- Rubber output is only partially gated through a smart splitter as the total rubber production is greater than 780/min, thus rubber will start to flow somewhat immediately.
- No mods required for use
- Schematic used: https://www.satisfactorytools.com/1.0/production?share=sq6wCQ8V8BlJLpdKJ5uR
- Počet položek 673
- Kategorie Complete factory Stable (1.0)
- Hodnocení
- Build version 385 279
- Autor x4077
- Stáhnout (196x) Stáhnout SBP Stáhnout SBP konfiguraci
- Velikost souboru 98,6 KB
- Vytvořeno 27. 2. 2025 4:45:51
- Naposledy aktualizováno 6. 6. 2025 7:24:20
- Živý náhled (Alpha Test) See blueprint