FULL VANILLA
This blueprint privides a 4 way hub for your hypertube network, along with accelerators, power storage & switches for minimal power consumption !
Simply place, and hook up power to the pole on the bottom floor (power storage floor), then connect your hypertubes to the entrances, in the corners of the 1st floor (see third picture).
Using the hub:
inbound : You will land in the jelly pad on the top floor (ensuring safety of ficsit property, thus why you need to make sure power is available to the hub)
outbound : on the top floor, walk to the desired power switch, turn it on, wait a few seconds, turn off and walk in the hypertube entrance
- Nombre d'objets 431
- Catégories Architecture Pipes system UPDATE 8
- Évaluation
- Version 273 254
- Auteur fa9gq
- Télécharger (1 611x) Télécharger le SBP Télécharger la configuration SBP
- Taille du fichier 38,74 KB
- Réalisé avec 12 janv. 2024 16:46:52
- Dernière mise à jour le 12 janv. 2024 16:49:24
- Prévisualisation en direct (Alpha Test) See blueprint