

FULL VANILLA
This blueprint privides a 4 way hub for your hypertube network, along with accelerators, power storage & switches for minimal power consumption !
Simply place, and hook up power to the pole on the bottom floor (power storage floor), then connect your hypertubes to the entrances, in the corners of the 1st floor (see third picture).
Using the hub:
inbound : You will land in the jelly pad on the top floor (ensuring safety of ficsit property, thus why you need to make sure power is available to the hub)
outbound : on the top floor, walk to the desired power switch, turn it on, wait a few seconds, turn off and walk in the hypertube entrance
- Recuento de objetos 431
- Categorías Architecture Pipes system UPDATE 8
- Puntuación
- Versión de compilación 273.254
- Autor fa9gq
- Descargar (1.465x) Descargar SBP Descargar configuración SBP
- Tamaño del archivo 38,74 KB
- Creado el 12/1/2024 16:46:52
- Última actualización el 12/1/2024 16:49:24
- Vista previa en vivo (Alpha Test) See blueprint