Modular Engines 5x5 1/min iron/rubber ONLY

1/min

input: 151.185 Iron Ore, 15 Rubber

sloopable to 2/min

v1.1 fixed issue with output belt on 2nd floor (connected to vertical lift)

  • Luotu 12.10.2024 21.45.08
  • Last updated on 15.10.2024 1.58.27