Modular Engines 5x5 1/min iron/rubber ONLY

1/min

input: 151.185 Iron Ore, 15 Rubber

sloopable to 2/min

v1.1 fixed issue with output belt on 2nd floor (connected to vertical lift)

  • Creado el 12/10/2024 21:45:08
  • Última actualización el 15/10/2024 1:58:27