Grassfields Metalworks
This is a whole of Southern Grassfields build that produces various primary materials, to support a medium sized factory. It is basically my Grassfields Railway megaprint plus supporting production facilities.
Logistics
Production is spread out across the map close to resource nodes. In the south east of this build, I am using the naturally occurring cave system to run conveyors through (to avoid conveyor sprawl aboveground). Some of the cave entrances my require you to nobalisk them.
2 trains are provided to collect materials and deposit them into a central warehouse. An additional 2 train stations on the north east side of the rail ring are intended for collecting materials globally, with the only fixed requirements are packaged fuel (linked to the truck stations) and aluminium ingots (linked to aluminium recipe production).
Power is controlled from a substation at the north side of the rail ring.
Iron Plates Building
In the north, next to the substation. 24 Iron Plate constructors.
Copper and Beam Buildings
South east of the rail ring. Consists of:
- 10 x Steel Beam constructors
- 72 x Copper Sheet constructors
Aluminium and SAM processing Buildings
East side of the ring, south of the warehouse. Consists of:
- 18 x Alclad Aluminium Sheet assemblers
- 3 x Alclad Casing assemblers
- 2 x Ficsite Ingot converters
- 6 x Ficsite Trigon constructors
- 6 x Iron Wire constructors
- 3 x Steel Pipe constructors
- 2 x SAM Fluctuator manufacturers
Steelworks Building
East. Consists of:
- 10 x Encased Industrial Pipe assemblers
- 28 x Steel Pipe constructors
Mineral Batching Plant
East. Consists of:
- 24 x Concrete constructors
- 5 Compacted Coal constructors
Rod Assembler Buildings
West. Consists of:
- 40 x Iron Rod constructors
- 42 x Cast Screw constructors
Wire and Frame Assembler Buildings
West. Consists of:
- 16 x Iron Plate constructors
- 16 x Cable constructors
- 20 x Fused Wire assemblers
- 16 x Fused Quickwire assemblers
- 16 x Reinforced Plate assemblers
- 12 x Modular Frame assemblers
Modded Content
Enlarged pieces for roads and walls.
Version History
v1.0, v2.0: Early Access versions v3.0: Redone for Stable 1.0
- Recuento de objetos 15.800
- Coordenadas -70.840 / 234.839
- Pegar sólo en la ubicación original Yes
- Categorías Architecture Complete factory Tracks system Modded Stable (1.0)
-
Puntuación
4 / 5
- Versión de compilación 372.858
- Autor xbb1024
- Descargar (14.581x) Descargar
- Tamaño del archivo 1,9 MB
- Creado el 28/9/2020 9:40:16
- Última actualización el 27/10/2024 14:55:22
-
Línea eléctrica
1.514
-
Cimientos 1m
1.177
-
Cinta transportadora Mk.5
997
-
Cinta Elevadora Mk.2
759
-
Pared Básica de 4m
684
-
Pared Inclinada de 8m
628
-
Cinta elevadora Mk.1
592
-
Divisor de Cinta transportadora
585
-
Cinta Elevadora Mk.5
515
-
Toma de corriente de pared Mk.1
486
-
Unión de cintas transportadoras
484
-
Poste de cinta transportadoras
481
-
Cimiento medio de 1m
391
-
Ventana enmarcada
347
-
Constructor
290
-
Cimientos 1m
273
-
Cimiento de armazón
265
-
Vía de tren
237
-
Pilar de hormigón grande
229
-
Cinta transportadora Mk.3
224
-
Cinta Transportadora Mk.2
206
-
Cinta transportadora Mk.4
204
-
Suelo de armazón
184
-
Agujero de suelo para cinta elevadora
169
-
Cimientos 4m
154
-
Horno
133
-
Pared Básica de 1m
128
-
Montura de tejado para cinta transportadora
125
-
Ensambladora
104
-
Farola
102
-
Ventana de panel
102
-
Cinta Elevadora Mk.3
92
-
Luz de techo
91
-
Rampa inv. de 1m
76
-
Escaleras de pasadizo
76
-
Pared Básica de 4m
75
-
Fundición
74
-
Contenedor de almacenamiento industrial
72
-
Pilar de hormigón pequeño
66
-
Ventana enmarcada
63
-
Cinta Elevadora Mk.4
62
-
Cimiento de armazón de cristal
60
-
Ventana de panel
60
-
Señal de bloque
59
-
Control por interruptor del ferrocarril
56
-
Cinta transportadora Mk.1
54
-
Viga de metal
53
-
Viga Pintada
50
-
Señal de trayecto
47
-
Pared Inclinada de 8m
43
-
Pared Básica de 4m
42
-
Ventana de panel
42
-
Cartel Cuadrado de 1m
41
-
Pasadizo Recto
38
-
Interruptor de alimentación
38
-
Tejado Plano
35
-
Pared con puerta lateral
34
-
Cañón de nieve de FICSIVIDAD
34
-
Pilar de armazón grande
33
-
Cantera Mk.3
33
-
Cimientos 1m
32
-
Cartel vertical
32
-
Plataforma de carga
32
-
Pilar de metal pequeño
31
-
Pilar de armazón pequeño
31
-
Rampa Doble de 2m
30
-
Cartel de Etiqueta de 3m
30
-
Esquina de pasadizo
27
-
Escalera
27
-
Tubería Mk.1
27
-
Tubería Mk.2
25
-
Cimiento medio de 4m
23
-
Cimientos 2m
22
-
Tejado de 1m
21
-
Cimiento medio de 2m
20
-
Pasadizo en Forma de T
19
-
Cimiento medio de 1m
18
-
Rampa de armazón invertida
18
-
Contenedor de almacenamiento
18
-
Cruce de unión de tuberías
18
-
Poste de Energía Mk.1
18
-
Extensión de Esquina Exterior de 4m
16
-
Ventana enmarcada completa
16
-
Pared cóncava inclinada 8m
16
-
Soporte de pared para cinta transportadora x3
15
-
Pared de Rampa de 1m
14
-
Portón automatizado
14
-
Divisor inteligente
14
-
Cimientos 1m
13
-
Tejado de 2m
12
-
Panel de control de iluminación
12
-
Pared para Cinta Transportadora x1
11
-
Barandilla Industrial
11
-
Tubería Mk.2 (Sin Indicador)
11
-
Esquina Inferior inv. de 1m
10
-
Pared Inclinada de 8m
10
-
Pared Básica de 1m
10
-
Pasadizo de Cruce
10
-
Soporte de pared para cinta transportadora
10
-
Soporte de Tubería
10
-
Pared de Rampa inv. de 8m
9
-
Cartel Cuadrado de 0,5m
9
-
Soporte de pared para tubería
9
-
Rampa Doble de 4m
8
-
Pared de Rampa inv. de 4m
8
-
Refinería
8
-
Estación de tren
8
-
Rampa Doble de 2m
7
-
Pared con puerta lateral
7
-
Extractor de agua
7
-
Tejado de 4m
6
-
Ventana individual
6
-
Barandilla moderna
6
-
Cimiento medio de 1m
5
-
Rampa de 4m
5
-
Pared Inclinada de 4m
5
-
Rampa de pasadizo
5
-
Poste de Energía Mk.2
5
-
Rampa Doble de 2m
4
-
Tejado Plano
4
-
Pared de Rampa de 2m
4
-
Ventana enmarcada
4
-
Interruptor de prioridad
4
-
Poste de Energía Mk.3
4
-
Rampa inv. de 4m
3
-
Pilar de metal grande
3
-
Pared de Rampa de 4m
3
-
Pared de Rampa de 4m
3
-
Pared de Rampa de 8m
3
-
Pared con puerta lateral
3
-
Pared con puerta en el centro
3
-
Pared para Cinta Transportadora x2
3
-
Barrera de contención
3
-
Esquina Superior de Rampa de 1m
2
-
Pared para Cinta Transportadora x2
2
-
Pared para Cinta Transportadora x1
2
-
Productor
2
-
Tanque de fluido industrial
2
-
Estación de camiones
2
-
Poste de cinta transportadora apilable
2
-
Bomba de tubería Mk.1
2
-
Esquina Superior inv. de 1m
1
-
Esquina Superior inv. de 1m
1
-
Esquina Inferior de Rampa de 1m
1
-
Rampa de 1m
1
-
Rampa Doble de 8m
1
-
Pared de Rampa inv. de 1m
1
-
Pared de Rampa inv. de 2m
1
-
Pared de Rampa de 1m
1
-
Ventana enmarcada hexagonal
1
-
Pared de armazón
1
-
Pared Inclinada de 4m
1
-
Soporte de pared para cinta transportadora x3
1
-
Cartel horizontal
1
-
Agujero de Pared para Tubería
1
-
Plataforma de torre de energía
1
-
Hormigón
21.615
-
Cable
7.364
-
Turboalambre
6.696
-
Viga de acero
5.230
-
Plancha de hierro
5.074
-
Alambre
4.946
-
Barra de hierro
4.392
-
Tubería de acero
3.970
-
Plancha de hierro reforzada
3.465
-
Nieve de verdad
3.400
-
Lámina de aluminio revestido
2.027
-
Rotor
1.298
-
Sílice
1.282
-
Armazón modular
770
-
Cristal de cuarzo
629
-
Lámina de Cobre
599
-
Viga industrial reforzada
408
-
Bastón de caramelo
340
-
Armazón modular fusionado
330
-
Armazón modular pesado
250
-
Motor
250
-
Conector de alta velocidad
199
-
Plástico
196
-
Ordenador
175
-
Supercomputadora
165
-
Circuito impreso
134
-
Taladro portátil
99
-
Motor turbo
99
-
Limitador de IA
88
-
Decoración de FICSIVIDAD
68
-
Goma
12
-
xbb1024 - 16/11/2022 9:09:24
I've added the inputs to the description
-
MadsOlsvig - 23/10/2022 19:38:19
@xbb1024 Do you have a list of requied raw items?
-
BlazerBuddy - 14/2/2022 3:25:56
Is it possible to have a raw items per minute list? I don't want to go to each individual smelter and count which raw materials I need.